BRIGHT STAR MATERIALS AND CONSTRUCTION

How many solar installs has BRIGHT STAR MATERIALS AND CONSTRUCTION done in California, and which license number is on its installs?

BRIGHT STAR MATERIALS AND CONSTRUCTION has 37 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Feb 24, 2025 to Aug 31, 2026), most of them in Los Angeles County (21), Kern County (7) and San Bernardino County (4). CSLB lists license 1087958 (BRIGHT STAR MATERIALS AND CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
37
Last 24 months
37
Total capacity
269.4 kW DC
Median system size
6.5 kW DC
With battery storage
54.1% all time; 54.1% last 24 months
Third-party owned
0.0% of 37 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
33 installs, latest Aug 31, 2026
Ownership types recorded
none recorded
Median battery size
12.8 kWh (18 installs list a capacity)
First install
Feb 24, 2025
Latest install
Aug 31, 2026
Counties
6
Utilities
SCE 31, PGE 6
CSLB license
1087958

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2025 to 2026

YearInstalls interconnectedWith battery storage
20252011
2026 (through Aug 31, 2026)179

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

33 of its 37 interconnected installs (89.2% of the 37 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 51.5% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0410.8%3 (75.0%)
Net Billing Tariff3389.2%17 (51.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on BRIGHT STAR MATERIALS AND CONSTRUCTION’s installs. No residential system in the file lists a third-party owner name that matches BRIGHT STAR MATERIALS AND CONSTRUCTION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 25 of BRIGHT STAR MATERIALS AND CONSTRUCTION’s 37 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (7, 28.0%) used modules recorded as JA Solar.

In the last 24 months, 37 of BRIGHT STAR MATERIALS AND CONSTRUCTION’s 37 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (15, 40.5%) used inverters recorded as Enphase.

In the last 24 months, 18 of BRIGHT STAR MATERIALS AND CONSTRUCTION’s 37 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (9, 50.0%) used batteries recorded as Enphase.

18 of 20 battery-paired PG&E and SCE installs (90.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar77
Hyundai55
Trina Solar55
Resun Solar22
EG411
Inverter makerEnphase1515
Hoymiles1111
APsystems (Altenergy Power System)66
EG444
AP Systems22
Battery makerEnphase99
Tesla55
SunPower22
Big battery11
EG411

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 25 of 37 installs, inverters on 37. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1087958BRIGHT STAR MATERIALS AND CONSTRUCTION (Corporation)CLEARB General Building ContractorMar 2, 2022Mar 31, 202836

License numbers are the ones the utilities recorded on the interconnection applications (37 of 37 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1087958. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles21
Kern7
San Bernardino4
Orange2
Riverside2
Ventura1

Top cities

CityInstalls
Bakersfield3
Calabasas3
Glendora3
Bell Gardens2
Wasco2
Barstow1
Beaumont1
Carson1
Delano1
Helendale1
Hemet1
Huntington Beach1
La Canada1
La Verne1
Lawndale1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BRIGHT STAR MATERIALS AND CONSTRUCTION37

Common questions

Where does BRIGHT STAR MATERIALS AND CONSTRUCTION install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (21 installs), followed by Kern County (7).

How often does BRIGHT STAR MATERIALS AND CONSTRUCTION install batteries with solar?

54.1% of its interconnected solar installs include battery storage across all years, and 54.1% in the last 24 months (20 of 37).

How many BRIGHT STAR MATERIALS AND CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

33 of its 37 interconnected installs (89.2% of the 37 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 51.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.