Bright Life Solar

How many solar installs has Bright Life Solar done in California, and which license number is on its installs?

Bright Life Solar has 773 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Jul 6, 2013 to Jul 1, 2026), most of them in Orange County (488), Los Angeles County (124) and San Bernardino County (60). CSLB lists license 1029267 (BRIGHT LIFE REMODELING) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, C-46, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Bright Life Solar here carry more than one CSLB license number: 1029267 on 386 (CSLB holder BRIGHT LIFE REMODELING, Costa Mesa), 981632 on 361 (not found in the CSLB License Master file) and 981362 on 12 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
773
Last 24 months
34
Total capacity
5,668.9 kW DC
Median system size
6.3 kW DC
With battery storage
12.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 65.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
4.8% of 645 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
27 installs, latest Jul 1, 2026
Ownership types recorded
PPA 31
Median battery size
13.5 kWh (80 installs list a capacity)
First install
Jul 6, 2013
Latest install
Jul 1, 2026
Counties
8
Utilities
SCE 637, SDGE 107, PGE 29
CSLB license
1029267, 981632, 981362

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201340
201460
20151970
2016890
20171040
2018769
2019548
20205413
2021315
20227115
20234311
2024133
20252111
2026 (through Aug 31, 2026)105

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

27 of its 773 interconnected installs (3.5% of the 773 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jul 1, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.035946.4%not counted
NEM 2.038750.1%59 (19.5%)
Net Billing Tariff273.5%17 (85.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 31 of Bright Life Solar’s installs the utility recorded a third-party ownership type: PPA 31, lease 0, prepaid lease 0, other 0. Across all installers, 18 residential systems list a third-party owner name that matches Bright Life Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Bright Life Solar18
Sunnova11
Solstice Energy1
Sunnova Energy1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 33 of Bright Life Solar’s 34 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (14, 42.4%) used modules recorded as Solaria.

In the last 24 months, 34 of Bright Life Solar’s 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (21, 61.8%) used inverters recorded as Enphase.

In the last 24 months, 17 of Bright Life Solar’s 34 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (17, 100.0%) used batteries recorded as Tesla.

76 of 80 battery-paired PG&E and SCE installs (95.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolaria1482
Hyundai5not in top list
United Renewable Energy5not in top list
Qcells3not in top list
Panasonic2153
Inverter makerEnphase21142
Tesla13not in top list
Battery makerTesla1761

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 626 of 773 installs, inverters on 771. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Bright Life Solar as developer on 29 battery storage projects and as installer on 29 (29 name it as both), 29 projects in all with 491 kWh of storage. 22 have the status Paid, with $100,617 in current incentive allocations. Applications were received from May 1, 2017 to Nov 15, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid22394$100,617
Cancelled797$23,043

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage26373$99,99619$76,953
Large-Scale Storage3119$23,6643$23,664

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1029267BRIGHT LIFE REMODELING (Corporation)CLEARB General Building Contractor; C-39 Roofing Contractor; C-46 Solar ContractorJul 25, 2017Jul 31, 2027386
981632Not found in the CSLB License Master file pulled Nov 4, 2026361
981362Not found in the CSLB License Master file pulled Nov 4, 202612

License numbers are the ones the utilities recorded on the interconnection applications (762 of 773 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1029267. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Orange488
Los Angeles124
San Bernardino60
San Diego37
Riverside33
Santa Clara28
Ventura2
San Mateo1

Top cities

CityInstalls
Newport Beach61
Corona del Mar38
Santa Ana36
Huntington Beach31
Long Beach31
Garden Grove28
Westminster27
San Jose26
Irvine23
Orange22
Dana Point18
Fountain Valley18
Laguna Hills18
San Clemente18
Mission Viejo16

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Bright Life Solar366
BRIGHT LIFE SOLAR INC DBA BRIGHT LIFE REMODELING159
BRIGHT LIFE SOLAR INC147
BRIGHT LIFE SOLAR88
BRIGHT LIFE SOLAR LLC12
bright life solar1

Common questions

Where does Bright Life Solar install solar?

Its installs are spread across 8 counties. The most are in Orange County (488 installs), followed by Los Angeles County (124).

How often does Bright Life Solar install batteries with solar?

12.0% of its interconnected solar installs include battery storage across all years, and 65.4% in the last 24 months (17 of 26). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Bright Life Solar installs are under NEM 3.0 (the Net Billing Tariff)?

27 of its 773 interconnected installs (3.5% of the 773 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 85.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.