AMS BUILDERS

How many solar installs has AMS BUILDERS done in California, and which license number is on its installs?

AMS BUILDERS has 96 residential solar installs interconnected in California, active in the records from 2023 through 2024 (Mar 21, 2023 to Oct 22, 2024), most of them in Los Angeles County (32), Riverside County (23) and San Bernardino County (23). The license number recorded on most of its installs, 1095303, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
96
Last 24 months
2
Total capacity
839.4 kW DC
Median system size
8.5 kW DC
With battery storage
2.1% all time; 0.0% last 24 months
Third-party owned
0.0% of 96 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Mar 20, 2024
Ownership types recorded
none recorded
Median battery size
18.5 kWh (2 installs list a capacity)
First install
Mar 21, 2023
Latest install
Oct 22, 2024
Counties
8
Utilities
SCE 95, PGE 1
CSLB license
1095303

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
2023641
2024321
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 96 interconnected installs (2.1% of the 96 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 20, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.09497.9%1 (1.1%)
Net Billing Tariff22.1%1 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on AMS BUILDERS’s installs. No residential system in the file lists a third-party owner name that matches AMS BUILDERS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of AMS BUILDERS’ 2 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as Mitrex.

In the last 24 months, 2 of AMS BUILDERS’ 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1, 50.0%) used inverters recorded as Enphase.

In the last 24 months, none of AMS BUILDERS’ 2 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMitrex256
Qcells116
Inverter makerEnphase157
SunPower19
Battery makerEnphase01
Tesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 96 of 96 installs, inverters on 96. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1095303Not found in the CSLB License Master file pulled Nov 4, 202696

License numbers are the ones the utilities recorded on the interconnection applications (96 of 96 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list AMS BUILDERS’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20222023Total
unincorporated San Diego County1095303178

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles32
Riverside23
San Bernardino23
Orange8
Tulare5
Kern3
San Luis Obispo1
Ventura1

Top cities

CityInstalls
Lancaster13
Temecula6
San Bernardino4
Tulare4
Yucaipa4
Corona3
Murrieta3
Palmdale3
Riverside3
Apple Valley2
Cerritos2
Fullerton2
Menifee2
Orange2
Quartz Hill2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AMS BUILDERS96

Common questions

Where does AMS BUILDERS install solar?

Its installs are spread across 8 counties. The most are in Los Angeles County (32 installs), followed by Riverside County (23).

How often does AMS BUILDERS install batteries with solar?

2.1% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 2).

How many AMS BUILDERS installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 96 interconnected installs (2.1% of the 96 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.