How many solar installs has All Valley Solar done in California, and which license number is on its installs?

All Valley Solar has 110 residential solar installs interconnected in California, active in the records from 2005 through 2026 (Sep 23, 2005 to Jul 17, 2026), most of them in Los Angeles County (78), Ventura County (16) and Fresno County (13). CSLB lists license 499720 (ALL VALLEY SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Aug 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to All Valley Solar here carry more than one CSLB license number: 499720 on 97 (CSLB holder ALL VALLEY SOLAR INC, N Hollywood) and 1037730 on 13 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
110
Last 24 months
10
Total capacity
723 kW DC
Median system size
6.1 kW DC
With battery storage
4.5% all time; 40.0% last 24 months
Third-party owned
2.8% of 107 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Jul 17, 2026
Ownership types recorded
lease 3
Median battery size
13.5 kWh (5 installs list a capacity)
First install
Sep 23, 2005
Latest install
Jul 17, 2026
Counties
5
Utilities
SCE 97, PGE 13
CSLB license
499720, 1037730

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2005 to 2026

YearInstalls interconnectedWith battery storage
200530
200600
200720
200810
2009150
2010120
201190
201280
2013160
201400
201500
201600
201720
201890
201970
202000
202130
202241
202360
202430
202541
2026 (through Aug 31, 2026)63

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 110 interconnected installs (3.6% of the 110 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06861.8%not counted
NEM 2.03834.5%3 (7.9%)
Net Billing Tariff43.6%2 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 3 of All Valley Solar’s installs the utility recorded a third-party ownership type: PPA 0, lease 3, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches All Valley Solar exactly.

Third-party owner named on its installsInstalls
SunPower Capital, LLC2
SunPower SolarProgram I, LLC c/o SunPower Corporation1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of All Valley Solar’s 10 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (5, 50.0%) used modules recorded as SunPower.

In the last 24 months, 10 of All Valley Solar’s 10 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 60.0%) used inverters recorded as Enphase.

In the last 24 months, 4 of All Valley Solar’s 10 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 75.0%) used batteries recorded as Tesla.

5 of 5 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower517
REC36
Aptos Solar11
Seraphim1not in top list
Inverter makerEnphase615
Tesla45
Battery makerTesla33
Enphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 43 of 110 installs, inverters on 110. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names All Valley Solar as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 40 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Dec 10, 2025 to Dec 11, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Reserved240$39,600

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency240$39,6000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
499720ALL VALLEY SOLAR INC (Corporation)CLEARC-46 Solar ContractorOct 14, 1986Aug 31, 202797
1037730Not found in the CSLB License Master file pulled Nov 4, 202613

License numbers are the ones the utilities recorded on the interconnection applications (110 of 110 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 499720. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles78
Ventura16
Fresno13
Orange2
Riverside1

Top cities

CityInstalls
Santa Monica31
Fresno9
Clovis4
Malibu4
Manhattan Beach4
Thousand Oaks4
Topanga4
Ventura4
Beverly Hills3
Moorpark3
Redondo Beach3
Westlake Village3
Calabasas2
Castaic2
Hermosa Beach2

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
All Valley Solar68
ALL VALLEY SOLAR INC28
All VAlley Solar8
ALL VALLEY SOLAR5
all valley solar1

Common questions

Where does All Valley Solar install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (78 installs), followed by Ventura County (16).

How often does All Valley Solar install batteries with solar?

4.5% of its interconnected solar installs include battery storage across all years, and 40.0% in the last 24 months (4 of 10).

How many All Valley Solar installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 110 interconnected installs (3.6% of the 110 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.