ALL Save Energy

How many solar installs has ALL Save Energy done in California, and which license number is on its installs?

ALL Save Energy has 69 residential solar installs interconnected in California, active in the records from 2013 through 2025 (Jan 15, 2013 to Dec 16, 2025), most of them in San Joaquin County (40), Contra Costa County (8) and Solano County (7). CSLB lists license 976454 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
69
Last 24 months
5
Total capacity
698.9 kW DC
Median system size
9.5 kW DC
With battery storage
11.6% all time; 100.0% last 24 months
Third-party owned
0.0% of 69 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest Dec 16, 2025
Ownership types recorded
none recorded
Median battery size
38.4 kWh (1 installs list a capacity)
First install
Jan 15, 2013
Latest install
Dec 16, 2025
Counties
9
Utilities
PGE 69
CSLB license
976454

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201320
201420
201550
201640
201760
201800
201940
202020
202120
2022110
2023232
202442
202544
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 69 interconnected installs (10.1% of the 69 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 16, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01420.3%not counted
NEM 2.04869.6%0 (0.0%)
Net Billing Tariff710.1%7 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ALL Save Energy’s installs. No residential system in the file lists a third-party owner name that matches ALL Save Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of ALL Save Energy’s 5 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2, 40.0%) used modules recorded as Canadian Solar.

In the last 24 months, 5 of ALL Save Energy’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (5, 100.0%) used inverters recorded as Shenzhen Eternalplanet Energy Pingshan Ltd..

In the last 24 months, 5 of ALL Save Energy’s 5 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used batteries recorded as Shenzhen Eternalplanet Energy Pingshan Ltd..

7 of 8 battery-paired PG&E and SCE installs (87.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar214
Solar4America Technology Inc.2not in top list
Mission Solar1not in top list
Silfab15
Znshine120
Inverter makerShenzhen Eternalplanet Energy Pingshan Ltd.56
SolarEdge12
Battery makerShenzhen Eternalplanet Energy Pingshan Ltd.56

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 64 of 69 installs, inverters on 69. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ALL Save Energy as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 57 kWh of storage. 1 have the status Paid, with $16,496 in current incentive allocations. Applications were received from Aug 30, 2024 to Sep 23, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid119$16,496
Cancelled138$27,368

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency257$43,8631$16,496

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
976454Sole owner license (name not shown)CLEARB General Building Contractor; C-10 Electrical ContractorSep 11, 2012Sep 30, 202867

License numbers are the ones the utilities recorded on the interconnection applications (67 of 69 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 976454. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Joaquin40
Contra Costa8
Solano7
Calaveras4
Sacramento4
Napa2
Sonoma2
Placer1
Yolo1

Top cities

CityInstalls
Stockton15
Escalon9
Lodi6
Oakley6
Acampo4
Dixon4
Antioch2
Burson2
Galt2
Manteca2
Napa2
Suisun City2
Walnut Grove2
Winters2
Clements1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALL SAVE ENERGY48
ALL Save Energy16
All Save Energy5

Common questions

Where does ALL Save Energy install solar?

Its installs are spread across 9 counties. The most are in San Joaquin County (40 installs), followed by Contra Costa County (8).

How often does ALL Save Energy install batteries with solar?

11.6% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (5 of 5).

How many ALL Save Energy installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 69 interconnected installs (10.1% of the 69 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.