All In One

How many solar installs has All In One done in California, and which license number is on its installs?

All In One has 56 residential solar installs interconnected in California, active in the records from 2014 through 2016 (May 5, 2014 to Dec 14, 2016), most of them in Santa Clara County (29), Alameda County (6) and Contra Costa County (5). The license number recorded on most of its installs, 621661, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
56
Last 24 months
0
Total capacity
251.8 kW DC
Median system size
4.2 kW DC
With battery storage
1.8% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 56 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
May 5, 2014
Latest install
Dec 14, 2016
Counties
11
Utilities
PGE 56
CSLB license
621661

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014270
2015230
201661
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 56 interconnected installs with a tariff recorded (56) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.056100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on All In One’s installs. No residential system in the file lists a third-party owner name that matches All In One exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 54 of All In One’s 56 installs name a module maker in the “Generator Manufacturer” fields, and most of those (28, 51.9%) used modules recorded as Canadian Solar.

Across all years, 56 of All In One’s 56 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (24, 42.9%) used inverters recorded as Power-One.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar028
SolarWorld010
Qcells05
SunPower04
Hyundai02
Inverter makerPower-One024
Enphase012
APsystems (Altenergy Power System)09
ABB07
SolarEdge02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 54 of 56 installs, inverters on 56. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
621661Not found in the CSLB License Master file pulled Nov 4, 202656

License numbers are the ones the utilities recorded on the interconnection applications (56 of 56 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Santa Clara29
Alameda6
Contra Costa5
San Francisco3
San Joaquin3
Kern2
Monterey2
San Mateo2
Solano2
Santa Cruz1
Sonoma1

Top cities

CityInstalls
San Jose17
Gilroy4
Campbell3
San Francisco3
Sunnyvale3
Bakersfield2
Concord2
Oakland2
San Ramon2
Tracy2
Aromas1
Atherton1
Benicia1
Berkeley1
Boulder Creek1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
All In One51
All in One3
ALL IN ONE2

Common questions

Where does All In One install solar?

Its installs are spread across 11 counties. The most are in Santa Clara County (29 installs), followed by Alameda County (6).

How often does All In One install batteries with solar?

1.8% of its interconnected solar installs include battery storage across all years.

How many All In One installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 56 interconnected installs with a tariff recorded (56) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.