AICON TECHNOLOGIES

How many solar installs has AICON TECHNOLOGIES done in California, and which license number is on its installs?

AICON TECHNOLOGIES has 125 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Dec 11, 2020 to Aug 11, 2026), most of them in San Diego County (99), Orange County (11) and Riverside County (8). CSLB lists license 1068687 (AICON SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
125
Last 24 months
31
Total capacity
930 kW DC
Median system size
6.7 kW DC
With battery storage
40.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 85.7% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 125 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
35 installs, latest Aug 11, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (9 installs list a capacity)
First install
Dec 11, 2020
Latest install
Aug 11, 2026
Counties
4
Utilities
SDGE 103, SCE 22
CSLB license
1068687

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202010
202120
202240
2023802
202481
2025223
2026 (through Aug 31, 2026)83

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

35 of its 125 interconnected installs (28.0% of the 125 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 11, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.09072.0%3 (18.8%)
Net Billing Tariff3528.0%6 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on AICON TECHNOLOGIES’s installs. No residential system in the file lists a third-party owner name that matches AICON TECHNOLOGIES exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 31 of AICON TECHNOLOGIES’ 31 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 48.4%) used modules recorded as LONGi.

In the last 24 months, 31 of AICON TECHNOLOGIES’ 31 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (16, 51.6%) used inverters recorded as Enphase.

In the last 24 months, 6 of AICON TECHNOLOGIES’ 31 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 66.7%) used batteries recorded as Tesla.

9 of 9 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi1515
VietnamSunergyJointStockCompany3not in top list
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.2not in top list
HyperionSolar2not in top list
JA Solar2not in top list
Inverter makerEnphase16103
Tesla1313
EcoFlow1not in top list
ShenzhenEternalplanetEnergyPin1not in top list
Battery makerTesla44
EcoFlow11
Enphase12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 118 of 125 installs, inverters on 125. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1068687AICON SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorSep 10, 2020Sep 30, 2028125

License numbers are the ones the utilities recorded on the interconnection applications (125 of 125 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1068687. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list AICON TECHNOLOGIES’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20222023202420252026Total
unincorporated San Diego County106868742323234

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego99
Orange11
Riverside8
Los Angeles7

Top cities

CityInstalls
San Diego30
Escondido14
San Marcos10
Carlsbad8
Vista6
Oceanside5
Fallbrook4
Temecula4
El Cajon3
Encinitas3
San Clemente3
Bonsall2
La Mesa2
Santa Monica2
Trabuco Canyon2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AICON TECHNOLOGIES103
AICON TECHNOLOGIES DBA AICON SOLAR22

Common questions

Where does AICON TECHNOLOGIES install solar?

Its installs are spread across 4 counties. The most are in San Diego County (99 installs), followed by Orange County (11).

How often does AICON TECHNOLOGIES install batteries with solar?

40.9% of its interconnected solar installs include battery storage across all years, and 85.7% in the last 24 months (6 of 7). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many AICON TECHNOLOGIES installs are under NEM 3.0 (the Net Billing Tariff)?

35 of its 125 interconnected installs (28.0% of the 125 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.