4th Day Energy

How many solar installs has 4th Day Energy done in California, and which license number is on its installs?

4th Day Energy has 369 residential solar installs interconnected in California, active in the records from 2007 through 2024 (Nov 5, 2007 to May 13, 2024), most of them in Fresno County (299), Madera County (22) and Kings County (13). The license number recorded on most of its installs, 649702, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
369
Last 24 months
0
Total capacity
2,869.8 kW DC
Median system size
7.2 kW DC
With battery storage
0.8% all time; no installs in the last 24 months last 24 months
Third-party owned
3.6% of 363 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest May 13, 2024
Ownership types recorded
PPA 12, prepaid lease 1
Median battery size
19.2 kWh (1 installs list a capacity)
First install
Nov 5, 2007
Latest install
May 13, 2024
Counties
10
Utilities
PGE 351, SCE 18
CSLB license
649702

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
200730
200850
200950
201050
201170
201230
2013160
2014340
2015700
2016650
2017550
2018310
2019140
202090
2021130
2022170
2023152
202421
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 369 interconnected installs (0.8% of the 369 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The latest Net Billing Tariff install was approved May 13, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.021658.5%not counted
NEM 2.015040.7%1 (0.7%)
Net Billing Tariff30.8%2 (66.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 13 of 4th Day Energy’s installs the utility recorded a third-party ownership type: PPA 12, lease 0, prepaid lease 1, other 0. Across all installers, 2 residential systems list a third-party owner name that matches 4th Day Energy exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Solkraft, Inc.8
4th Day Energy2
Kilowatt Systems, LLC2
Solwerks1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 352 of 4th Day Energy’s 369 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (125, 35.5%) used modules recorded as Canadian Solar.

Across all years, 369 of 4th Day Energy’s 369 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (182, 49.3%) used inverters recorded as SolarEdge.

Across all years, 3 of 4th Day Energy’s 369 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used batteries recorded as Enphase.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar0125
Qcells063
SolarWorld052
REC039
Phono Solar Technology011
Inverter makerSolarEdge0182
Enphase0159
SMA024
Sol-Ark04
Fronius02
Battery makerEnphase02
Stored Energy Inc01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 352 of 369 installs, inverters on 369. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
649702Not found in the CSLB License Master file pulled Nov 4, 2026325

License numbers are the ones the utilities recorded on the interconnection applications (326 of 369 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Fresno299
Madera22
Kings13
Tulare13
Merced12
Kern3
Santa Cruz3
Contra Costa2
San Joaquin1
Santa Clara1

Top cities

CityInstalls
Fresno134
Clovis93
Tollhouse16
Madera14
Sanger13
Auberry12
Hanford9
Kingsburg8
Reedley8
Atwater7
Visalia7
Prather5
Caruthers4
Lemoore4
Bakersfield3

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
4th Day Energy292
4TH DAY ENERGY64
4th DAY ENERGY7
4th Day energy5
4TH Day Energy1

Common questions

Where does 4th Day Energy install solar?

Its installs are spread across 10 counties. The most are in Fresno County (299 installs), followed by Madera County (22).

How often does 4th Day Energy install batteries with solar?

0.8% of its interconnected solar installs include battery storage across all years.

How many 4th Day Energy installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 369 interconnected installs (0.8% of the 369 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.