Solar in Sacramento: city solar permits by year and interconnected installs outside SMUD

Who installs solar in Sacramento?

The City of Sacramento is served by SMUD, which does not report to California DG Stats, so the utility interconnection records in this index show only 333 residential solar installs in all of Sacramento County, in the parts served by PG&E, and 6 under the service city Sacramento. The City of Sacramento Community Development Department issued 481 residential solar permits for existing homes in 2025 and 355 permits matching the battery filter, according to its open data: Building Permits Issued, archive and current-year layers, City of Sacramento open data. The city’s permit data names contractors but not their license numbers, so it is not linked to installers here.

These rankings count systems the utilities connected. They do not measure price, workmanship, reviews or customer service. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Solar permits issued in the City of Sacramento

From The City of Sacramento Community Development Department’s open data: Building Permits Issued, archive and current-year layers, City of Sacramento open data. Counted by calendar year of the Status_Date field. Solar: Work_Desc contains SOLAR or PHOTOVOLTAIC, or Category = 'Solar System'; Type = 'Residential'; Sub_Type is 'Web-Minor' or 'Minor' (permits for existing homes); descriptions that begin with a 0 kW or null solar size are left out. Battery: Type = 'Residential' and Work_Desc lists a nonzero PV storage size or mentions BATTER, ENERGY STORAGE or POWERWALL. Checked Nov 16, 2026.

YearSolar permitsBattery permits
20181,15614
20191,09318
20201,13331
20211,00031
202293639
202357576
202440671
2025481355
2026 (through Nov 16, 2026)576897

A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected. Sacramento homes are served by SMUD, which does not report to California DG Stats, so the city’s permits are the public record of rooftop solar there on this site. New homes, which California requires to include solar, are filed as new-building and production permits and are not in the solar count. The layer names the contractor but no license number, so permits are not linked to installers.

Solar permits Sacramento County issues in unincorporated areas are on the Sacramento County solar permits page.

Sacramento County installs in the utility record (PG&E areas), Sep 2024 through Aug 2026

37 installs in the window, 333 in all. Cities: Walnut Grove (114), Isleton (89), Galt (52), Elverta (50), Ryde (7), Sacramento (6).

1Sunrun4242
2Tesla Energy Operations (formerly SolarCity)3232
3Infinity Energy, Inc1414
4FREEDOM FOREVER LLC1212
5V3 Electric1212
6Future Energy Corporation1010
7Sierra Pacific Home & Comfort77
8BRIGHT OPS55
9The Solar Company55
10Vivint Solar Developer, LLC55

Equipment recorded in Sacramento County (PG&E areas)

In the last 24 months, 35 of Sacramento County’s 37 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (8, 22.9%) used modules recorded as Qcells.

In the last 24 months, 37 of Sacramento County’s 37 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (15, 40.5%) used inverters recorded as Tesla.

In the last 24 months, 25 of Sacramento County’s 37 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (11, 44.0%) used batteries recorded as Tesla.

64 of 70 battery-paired PG&E and SCE installs (91.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells864
JA Solar728
Canadian Solar428
REC423
LONGi322
Inverter makerTesla1536
Enphase1292
SolarEdge9119
Sol-Ark2not in top list
Delta Electronics1not in top list
Battery makerTesla1131
Enphase710
SolarEdge512
FranklinWH11
PointGuard Energy Inc.11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 319 of 333 installs, inverters on 333. See the methodology and the equipment index.

Sacramento County page.

Common questions

Why does Sacramento have so few installs on this site?

The City of Sacramento is served by SMUD, a municipal utility that does not report to California DG Stats. This index counts PG&E, SCE and SDG&E interconnections, so it adds the City of Sacramento’s own permit data.

Does the permit count include new homes?

No. New homes, which California requires to include solar, are filed as new-building and production permits and are left out of the solar count on this page.

Does a permit count measure an installer’s quality?

No. These rankings count systems the utilities connected. They do not measure price, workmanship, reviews or customer service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.