Sacramento County issued 647 residential solar permits in unincorporated Sacramento County in 2025 and 289 permits matching the battery filter, according to its open data: Permits, Sacramento County ArcGIS layer listed on data.saccounty.gov. The City of Sacramento Community Development Department issued 481 residential solar permits for existing homes in 2025 and 355 permits matching the battery filter, according to its open data: Building Permits Issued, archive and current-year layers, City of Sacramento open data. Together that is 1,128 permits from the two agencies whose data this index reads; Elk Grove, Folsom, Citrus Heights and the county’s other cities issue their own permits and are not counted here.

A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected. Both datasets name contractors but publish no license number, so these permits are counted by year and month only and are not linked to any installer.

Most of Sacramento County is served by SMUD, a municipal utility that does not report to California DG Stats, so the county’s and the city’s permit records are the public record of rooftop solar there on this site. Each agency counts with its own filter, quoted below. The most in a full year shown was 908 in 2021. 289 of the 647 solar permits issued in 2025 (44.7%) match the battery filter.

Solar permits issued in unincorporated Sacramento County

From Sacramento County’s open data: Permits, Sacramento County ArcGIS layer listed on data.saccounty.gov. Counted by calendar year of the ISSUED_DATE field. Solar: Application_Type = 'Residential' and either PermitCategory = 'SolarApp', or PermitCategory = 'MISR' (miscellaneous residential) with a WorkDescription that names a photovoltaic or solar PV system, rooftop solar or solar panels, or mentions solar with kW or modules; descriptions about removing and reinstalling, adding to existing solar, pool or water heating, or 'no solar' are left out. Battery: those solar permits whose WorkDescription mentions BATTER, ENERGY STORAGE or POWERWALL (any case). Latest solar permit issue date in the data: Nov 14, 2026. Checked Nov 16, 2026.

YearSolar permitsBattery permits
2021908115
2022811145
2023587104
2024396104
2025647289
2026 (through Nov 16, 2026)740326

By month, December 2024 to November 2026

Month issuedSolar permitsWith a battery
December 2024298
January 20254014
February 2025224
March 202514556
April 20253612
May 20253913
June 20253216
July 20253218
August 20255132
September 20255530
October 20254929
November 20256927
December 20257738
January 20263318
February 20261813
March 20263714
April 20263421
May 20263819
June 202611335
July 202611527
August 202610255
September 202613448
October 20267849
November 2026 (through Nov 16, 2026)3827

A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected. Sacramento County issues building permits for the unincorporated county. Cities such as Sacramento, Elk Grove, Citrus Heights, Folsom and Rancho Cordova issue their own; the City of Sacramento’s are shown separately. Most of the county is served by SMUD, which does not report to California DG Stats. The layer’s issue dates begin in 2021, so earlier years are not shown. New homes, filed as new-building and production permits, are not in the solar count. The layer names a contractor on most permits but no license number, so permits are not linked to installers.

Solar permits issued in the City of Sacramento

From The City of Sacramento Community Development Department’s open data: Building Permits Issued, archive and current-year layers, City of Sacramento open data. Counted by calendar year of the Status_Date field. Solar: Work_Desc contains SOLAR or PHOTOVOLTAIC, or Category = 'Solar System'; Type = 'Residential'; Sub_Type is 'Web-Minor' or 'Minor' (permits for existing homes); descriptions that begin with a 0 kW or null solar size are left out. Battery: Type = 'Residential' and Work_Desc lists a nonzero PV storage size or mentions BATTER, ENERGY STORAGE or POWERWALL. Checked Nov 16, 2026.

YearSolar permitsBattery permits
20181,15614
20191,09318
20201,13331
20211,00031
202293639
202357576
202440671
2025481355
2026 (through Nov 16, 2026)576897

A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected. Sacramento homes are served by SMUD, which does not report to California DG Stats, so the city’s permits are the public record of rooftop solar there on this site. New homes, which California requires to include solar, are filed as new-building and production permits and are not in the solar count. The layer names the contractor but no license number, so permits are not linked to installers.

The City of Sacramento’s utility records and installer rankings are on the Sacramento solar page, and PG&E-area installs in the county on the Sacramento County page.

Common questions

What share of Sacramento County solar permits included a battery in 2025?

In unincorporated Sacramento County, 289 of 647 (44.7%) residential solar permits issued in 2025 mention a battery, energy storage or a Powerwall in the work description.

Why are Sacramento solar permits not in the utility interconnection counts?

SMUD, which serves most of Sacramento County, does not report to California DG Stats. This index counts PG&E, SCE and SDG&E interconnections, so for SMUD areas it shows permit records instead.

Do the counts include new homes?

No. New homes, which California requires to include solar, are filed as new-building and production permits in both datasets and are left out of the solar counts.