Findleton Electric

How many solar installs has Findleton Electric done in California, and which license number is on its installs?

Findleton Electric has 59 residential solar installs interconnected in California, active in the records from 2015 through 2020 (Jan 5, 2015 to Aug 3, 2020), most of them in El Dorado County (41), Placer County (8) and Nevada County (3). The license number recorded on most of its installs, 998682, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
59
Last 24 months
0
Total capacity
513.8 kW DC
Median system size
8.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 59 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jan 5, 2015
Latest install
Aug 3, 2020
Counties
8
Utilities
PGE 59
CSLB license
998682

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201530
2016110
2017120
2018160
2019150
202020
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 59 interconnected installs with a tariff recorded (59) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01423.7%not counted
NEM 2.04576.3%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Findleton Electric’s installs. No residential system in the file lists a third-party owner name that matches Findleton Electric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 59 of Findleton Electric’s 59 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (18, 30.5%) used modules recorded as Mission Solar.

Across all years, 59 of Findleton Electric’s 59 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (36, 61.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar018
Canadian Solar013
Qcells012
LG011
Sanyo02
Inverter makerEnphase036
SMA018
SolarEdge05

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 59 of 59 installs, inverters on 59. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
998682Not found in the CSLB License Master file pulled Nov 4, 202657

License numbers are the ones the utilities recorded on the interconnection applications (59 of 59 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
El Dorado41
Placer8
Nevada3
Humboldt2
Merced2
Fresno1
San Joaquin1
Tehama1

Top cities

CityInstalls
Shingle Springs7
Cameron Park5
Placerville5
El Dorado Hills4
Garden Valley4
Grass Valley3
Somerset3
Cool2
El Dorado2
Fortuna2
Granite Bay2
Lincoln2
Los Banos2
Lotus2
Newcastle2

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Findleton Electric51
FINDLETON ELECTRIC6
findleton electric1
FIndleton Electric1

Common questions

Where does Findleton Electric install solar?

Its installs are spread across 8 counties. The most are in El Dorado County (41 installs), followed by Placer County (8).

How often does Findleton Electric install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Findleton Electric installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 59 interconnected installs with a tariff recorded (59) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.