Home solar in ZIP code 94580, California
Service city recorded on most installs: San Lorenzo. County: Alameda County.
How many homes in ZIP code 94580 have solar?
PG&E, SCE and SDG&E interconnected 873 residential solar systems in ZIP code 94580 through Aug 31, 2026, 135 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded San Lorenzo, Alameda County, as the service city on 873 of them. Sunrun has the most installs recorded in this ZIP, 150.
Counts of interconnected systems from utility records, not a rating of any installer.
Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
At a glance
- Residential solar installs
- 873
- Last 24 months
- 135 (Sep 2024 through Aug 2026)
- Capacity
- 4,242 kW DC
- Median system size
- 4.5 kW DC
- Net Billing Tariff (NEM 3.0)
- 163 installs, 18.7% of those with a tariff recorded
- Utility
- PGE 873
- First install in data
- Dec 15, 2003
- Latest install in data
- Aug 25, 2026
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2003 | 1 | 0 |
| 2004 | 0 | 0 |
| 2005 | 1 | 0 |
| 2006 | 2 | 0 |
| 2007 | 2 | 0 |
| 2008 | 8 | 0 |
| 2009 | 11 | 0 |
| 2010 | 4 | 0 |
| 2011 | 3 | 0 |
| 2012 | 7 | 0 |
| 2013 | 13 | 0 |
| 2014 | 36 | 0 |
| 2015 | 40 | 0 |
| 2016 | 45 | 0 |
| 2017 | 65 | 0 |
| 2018 | 64 | 2 |
| 2019 | 74 | 3 |
| 2020 | 48 | 4 |
| 2021 | 91 | 9 |
| 2022 | 84 | 20 |
| 2023 | 100 | 11 |
| 2024 | 67 | 53 |
| 2025 | 64 | 59 |
| 2026 (through Aug 31, 2026) | 43 | 40 |
Battery storage
23.0% of the residential solar installs here include battery storage across all years (201 of 873). In the last 24 months the share was 94.1% (127 of 135).
Net metering tariff
Of the 873 installs with a net metering tariff recorded: NEM 1.0 178 (20.4%), NEM 2.0 532 (60.9%), the Net Billing Tariff (often called NEM 3.0) 163 (18.7%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Lease, PPA or owned
37.6% of the 873 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 545 are recorded as not third-party owned. Ownership types recorded: PPA 281, lease 39, prepaid lease 3, other 5.
Installers by installs in 94580
Installers with a page in this index, most installs in this ZIP first. 132 such installers have at least one install here. 17 more installs were by 16 installer names without a page in this index. 7 were self-installed or had no installer recorded. Counts of connected systems, not a rating.
| Installer | Installs in 94580 | Last 24 months |
|---|---|---|
| Sunrun | 150 | 40 |
| Tesla Energy Operations (formerly SolarCity) | 134 | 14 |
| Vivint Solar Developer, LLC | 89 | 0 |
| SunPower | 42 | 0 |
| BRIGHT OPS | 33 | 32 |
| BETTER EARTH ELECTRIC INC | 25 | 2 |
| Semper Solaris Construction Inc | 21 | 2 |
| FREEDOM FOREVER LLC | 19 | 5 |
| Nexus Energy Systems | 13 | 1 |
| Empower Electric Solar | 12 | 0 |
City and county recorded for 94580
The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.
| Recorded as | Installs |
|---|---|
| City: San Lorenzo | 873 |
| County: Alameda County | 873 |
Common questions
How common are home batteries with solar in 94580?
23.0% of the residential solar installs here include battery storage across all years (201 of 873). In the last 24 months the share was 94.1% (127 of 135).
How many solar installs in 94580 are under NEM 3.0?
163 of the 873 installs here with a tariff recorded (18.7%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.
Which solar installers have the most installs in 94580?
Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sunrun (150), Tesla Energy Operations (formerly SolarCity) (134), Vivint Solar Developer, LLC (89). These are counts of connected systems, not a rating of price, workmanship or service.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.