Home solar in ZIP code 93737, California

Service city recorded on most installs: Fresno. County: Fresno County.

How many homes in ZIP code 93737 have solar?

PG&E, SCE and SDG&E interconnected 1,256 residential solar systems in ZIP code 93737 through Aug 31, 2026, 118 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Fresno, Fresno County, as the service city on 1,256 of them. Sunrun has the most installs recorded in this ZIP, 225.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
1,256
Last 24 months
118 (Sep 2024 through Aug 2026)
Capacity
9,679.1 kW DC
Median system size
6.8 kW DC
Net Billing Tariff (NEM 3.0)
94 installs, 7.5% of those with a tariff recorded
Utility
PGE 1,256
First install in data
Jan 19, 2011
Latest install in data
Aug 20, 2026

Installs by year

YearInstalls interconnectedWith battery storage
201160
2012160
2013230
2014380
2015500
2016540
2017570
20181010
20191181
20201062
20211652
20222044
20231368
20249270
20256966
2026 (through Aug 31, 2026)2120

Battery storage

13.8% of the residential solar installs here include battery storage across all years (173 of 1,256). In the last 24 months the share was 94.1% (111 of 118).

Net metering tariff

Of the 1,256 installs with a net metering tariff recorded: NEM 1.0 196 (15.6%), NEM 2.0 966 (76.9%), the Net Billing Tariff (often called NEM 3.0) 94 (7.5%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

35.3% of the 1,256 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 813 are recorded as not third-party owned. Ownership types recorded: PPA 297, lease 144, prepaid lease 1, other 1.

Installers by installs in 93737

Installers with a page in this index, most installs in this ZIP first. 126 such installers have at least one install here. 27 more installs were by 25 installer names without a page in this index. 35 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 93737Last 24 months
Sunrun22527
SunPower2081
Infinity Energy, Inc9520
Tesla Energy Operations (formerly SolarCity)837
Quality Home Services611
SOLAR NEGOTIATORS5811
Energy Concepts351
Vivint Solar Developer, LLC280
Nova West Solar220
Arise Solar210

City and county recorded for 93737

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Fresno1,256
County: Fresno County1,256

Common questions

How common are home batteries with solar in 93737?

13.8% of the residential solar installs here include battery storage across all years (173 of 1,256). In the last 24 months the share was 94.1% (111 of 118).

How many solar installs in 93737 are under NEM 3.0?

94 of the 1,256 installs here with a tariff recorded (7.5%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 93737?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sunrun (225), SunPower (208), Infinity Energy, Inc (95). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.