Home solar in ZIP code 93270, California
Service city recorded on most installs: Terra Bella. County: Tulare County.
How many homes in ZIP code 93270 have solar?
PG&E, SCE and SDG&E interconnected 264 residential solar systems in ZIP code 93270 through Aug 31, 2026, 49 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Terra Bella, Tulare County, as the service city on 264 of them. Tesla Energy Operations (formerly SolarCity) has the most installs recorded in this ZIP, 36.
Counts of interconnected systems from utility records, not a rating of any installer.
Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
At a glance
- Residential solar installs
- 264
- Last 24 months
- 49 (Sep 2024 through Aug 2026)
- Capacity
- 2,246.2 kW DC
- Median system size
- 7.7 kW DC
- Net Billing Tariff (NEM 3.0)
- 59 installs, 22.3% of those with a tariff recorded
- Utility
- SCE 264
- First install in data
- Aug 1, 2005
- Latest install in data
- Aug 7, 2026
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2005 | 1 | 0 |
| 2006 | 0 | 0 |
| 2007 | 0 | 0 |
| 2008 | 0 | 0 |
| 2009 | 2 | 0 |
| 2010 | 2 | 0 |
| 2011 | 4 | 0 |
| 2012 | 8 | 0 |
| 2013 | 7 | 0 |
| 2014 | 12 | 0 |
| 2015 | 28 | 0 |
| 2016 | 13 | 0 |
| 2017 | 10 | 0 |
| 2018 | 9 | 0 |
| 2019 | 11 | 1 |
| 2020 | 13 | 1 |
| 2021 | 14 | 1 |
| 2022 | 25 | 1 |
| 2023 | 39 | 2 |
| 2024 | 24 | 16 |
| 2025 | 29 | 26 |
| 2026 (through Aug 31, 2026) | 13 | 12 |
Battery storage
22.7% of the residential solar installs here include battery storage across all years (60 of 264). In the last 24 months the share was 87.8% (43 of 49).
Net metering tariff
Of the 264 installs with a net metering tariff recorded: NEM 1.0 83 (31.4%), NEM 2.0 122 (46.2%), the Net Billing Tariff (often called NEM 3.0) 59 (22.3%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Lease, PPA or owned
47.8% of the 245 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 128 are recorded as not third-party owned. Ownership types recorded: PPA 87, lease 19, other 11.
Installers by installs in 93270
Installers with a page in this index, most installs in this ZIP first. 78 such installers have at least one install here. 5 more installs were by 4 installer names without a page in this index. 10 were self-installed or had no installer recorded. Counts of connected systems, not a rating.
| Installer | Installs in 93270 | Last 24 months |
|---|---|---|
| Tesla Energy Operations (formerly SolarCity) | 36 | 0 |
| Sunrun | 31 | 7 |
| GRID Alternatives | 21 | 3 |
| Bright House Energy Construction | 15 | 2 |
| Infinity Energy, Inc | 12 | 0 |
| Clean Energy Solutions | 9 | 0 |
| BRIGHT OPS | 8 | 8 |
| Empower Electric Solar | 8 | 3 |
| FREEDOM FOREVER LLC | 6 | 1 |
| SOLGEN ELECTRIC | 6 | 0 |
City and county recorded for 93270
The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.
| Recorded as | Installs |
|---|---|
| City: Terra Bella | 264 |
| County: Tulare County | 263 |
1 other county on 1 install, each under 1% of this ZIP’s installs, are not listed.
Common questions
How common are home batteries with solar in 93270?
22.7% of the residential solar installs here include battery storage across all years (60 of 264). In the last 24 months the share was 87.8% (43 of 49).
How many solar installs in 93270 are under NEM 3.0?
59 of the 264 installs here with a tariff recorded (22.3%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.
Which solar installers have the most installs in 93270?
Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Tesla Energy Operations (formerly SolarCity) (36), Sunrun (31), GRID Alternatives (21). These are counts of connected systems, not a rating of price, workmanship or service.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.