Home solar in ZIP code 92118, California
Service city recorded on most installs: Coronado. County: San Diego County.
How many homes in ZIP code 92118 have solar?
PG&E, SCE and SDG&E interconnected 1,372 residential solar systems in ZIP code 92118 through Aug 31, 2026, 135 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Coronado, San Diego County, as the service city on 1,372 of them. Sullivan Solar Power has the most installs recorded in this ZIP, 118.
Counts of interconnected systems from utility records, not a rating of any installer.
Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
At a glance
- Residential solar installs
- 1,372
- Last 24 months
- 135 (Sep 2024 through Aug 2026)
- Capacity
- 8,292 kW DC
- Median system size
- 5.4 kW DC
- Net Billing Tariff (NEM 3.0)
- 160 installs, 11.7% of those with a tariff recorded
- Utility
- SDGE 1,372
- First install in data
- May 23, 2001
- Latest install in data
- Aug 26, 2026
Installs by year
| Year | Installs interconnected |
|---|---|
| 2001 | 1 |
| 2002 | 2 |
| 2003 | 2 |
| 2004 | 1 |
| 2005 | 2 |
| 2006 | 6 |
| 2007 | 6 |
| 2008 | 8 |
| 2009 | 23 |
| 2010 | 26 |
| 2011 | 10 |
| 2012 | 17 |
| 2013 | 38 |
| 2014 | 55 |
| 2015 | 90 |
| 2016 | 131 |
| 2017 | 82 |
| 2018 | 85 |
| 2019 | 92 |
| 2020 | 83 |
| 2021 | 87 |
| 2022 | 130 |
| 2023 | 181 |
| 2024 | 106 |
| 2025 | 80 |
| 2026 (through Aug 31, 2026) | 28 |
Battery storage
Battery storage is not recorded here: SDG&E files a battery as its own project record, not on the solar record, so this ZIP has no battery share.
Net metering tariff
Of the 1,372 installs with a net metering tariff recorded: NEM 1.0 364 (26.5%), NEM 2.0 848 (61.8%), the Net Billing Tariff (often called NEM 3.0) 160 (11.7%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Lease, PPA or owned
13.7% of the 1,150 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 993 are recorded as not third-party owned. Ownership types recorded: PPA 127, lease 23, prepaid lease 2, other 5.
Installers by installs in 92118
Installers with a page in this index, most installs in this ZIP first. 186 such installers have at least one install here. 40 more installs were by 32 installer names without a page in this index. 20 were self-installed or had no installer recorded. Counts of connected systems, not a rating.
| Installer | Installs in 92118 | Last 24 months |
|---|---|---|
| Sullivan Solar Power | 118 | 0 |
| Semper Solaris Construction Inc | 112 | 8 |
| Baker Electric, Inc. | 108 | 6 |
| Tesla Energy Operations (formerly SolarCity) | 96 | 3 |
| Sunrun | 82 | 6 |
| Stellar Solar | 50 | 6 |
| Eriksson | 32 | 5 |
| Sunline Energy Inc. | 28 | 1 |
| Solare Energy, Inc | 25 | 1 |
| Solartech | 24 | 3 |
City and county recorded for 92118
The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.
| Recorded as | Installs |
|---|---|
| City: Coronado | 1,372 |
| County: San Diego County | 1,372 |
Common questions
How common are home batteries with solar in 92118?
Battery storage is not recorded here: SDG&E files a battery as its own project record, not on the solar record, so this ZIP has no battery share.
How many solar installs in 92118 are under NEM 3.0?
160 of the 1,372 installs here with a tariff recorded (11.7%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.
Which solar installers have the most installs in 92118?
Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sullivan Solar Power (118), Semper Solaris Construction Inc (112), Baker Electric, Inc. (108). These are counts of connected systems, not a rating of price, workmanship or service.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.