US GREEN ENERGY TECHNOLOGIES

How many solar installs has US GREEN ENERGY TECHNOLOGIES done in California, and which license number is on its installs?

US GREEN ENERGY TECHNOLOGIES has 455 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Aug 17, 2011 to Apr 23, 2026), most of them in San Diego County (426), Orange County (18) and Riverside County (10). CSLB lists license 963490 (US GREEN SOLAR ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
455
Last 24 months
5
Total capacity
3,200.2 kW DC
Median system size
5.8 kW DC
With battery storage
9.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 100.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.9% of 339 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
5 installs, latest Apr 23, 2026
Ownership types recorded
PPA 2, prepaid lease 1
Median battery size
20.2 kWh (1 installs list a capacity)
First install
Aug 17, 2011
Latest install
Apr 23, 2026
Counties
4
Utilities
SDGE 444, SCE 10, PGE 1
CSLB license
963490

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201130
2012140
2013320
2014380
2015830
2016650
2017260
2018430
2019340
2020310
2021130
2022190
2023450
202440
202530
2026 (through Aug 31, 2026)21

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

5 of its 455 interconnected installs (1.1% of the 455 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Apr 23, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.021346.8%not counted
NEM 2.023752.1%0 (0.0%)
Net Billing Tariff51.1%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 3 of US GREEN ENERGY TECHNOLOGIES’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 1, other 0. Across all installers, 1 residential systems list a third-party owner name that matches US GREEN ENERGY TECHNOLOGIES exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
US Green2
US Green Energy Technologies1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of US GREEN ENERGY TECHNOLOGIES’ 5 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as Seraphim.

In the last 24 months, 5 of US GREEN ENERGY TECHNOLOGIES’ 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 80.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of US GREEN ENERGY TECHNOLOGIES’ 5 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSeraphim2not in top list
RSI Homes1not in top list
SEG Solar1not in top list
Inverter makerEnphase4116
SolarEdge1254
Battery makerEnphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 428 of 455 installs, inverters on 448. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names US GREEN ENERGY TECHNOLOGIES as developer on 24 battery storage projects and as installer on 21 (17 name it as both), 28 projects in all with 472 kWh of storage. 2 have the status Paid, with $12,218 in current incentive allocations. Applications were received from May 1, 2017 to Jan 11, 2018.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid235$12,218
Cancelled23396$136,435
RRF Rejected341$17,625

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage24405$139,3732$12,218
Large-Scale Storage126$9,2800$0
Not stated341$17,6250$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
963490US GREEN SOLAR ELECTRIC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJul 21, 2011Jul 31, 2027259

License numbers are the ones the utilities recorded on the interconnection applications (259 of 455 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 963490. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list US GREEN ENERGY TECHNOLOGIES’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County9634901094461011146

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego426
Orange18
Riverside10
San Luis Obispo1

Top cities

CityInstalls
San Diego179
Poway58
Spring Valley24
El Cajon23
Escondido21
Fallbrook15
Ramona15
Chula Vista14
Oceanside13
San Marcos13
Carlsbad8
La Jolla8
La Mesa7
Encinitas6
Murrieta5

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
US GREEN ENERGY TECHNOLOGIES442
US Green Energy Technologies5
US GREEN ENERGY TECHNOLOGIES INC4
US GREEN ENERGY TECHNOLOGIES INC DBA US GREEN SOLAR ELECTRIC3
US GREEN Energy Technologies1

Common questions

Where does US GREEN ENERGY TECHNOLOGIES install solar?

Its installs are spread across 4 counties. The most are in San Diego County (426 installs), followed by Orange County (18).

How often does US GREEN ENERGY TECHNOLOGIES install batteries with solar?

9.1% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (1 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many US GREEN ENERGY TECHNOLOGIES installs are under NEM 3.0 (the Net Billing Tariff)?

5 of its 455 interconnected installs (1.1% of the 455 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.