Todd Solar Engineering

How many solar installs has Todd Solar Engineering done in California, and which license number is on its installs?

Todd Solar Engineering has 39 residential solar installs interconnected in California, active in the records from 2016 through 2024 (Jan 6, 2016 to Dec 11, 2024), most of them in Orange County (17), San Bernardino County (8) and Riverside County (7). The license number recorded on most of its installs, 789098, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
39
Last 24 months
1
Total capacity
277.9 kW DC
Median system size
6.9 kW DC
With battery storage
2.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 39 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
10.5 kWh (1 installs list a capacity)
First install
Jan 6, 2016
Latest install
Dec 11, 2024
Counties
5
Utilities
SCE 38, SDGE 1
CSLB license
789098

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201650
201700
201830
201940
202000
202100
202280
2023150
202441
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 39 interconnected installs with a tariff recorded (39) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0512.8%not counted
NEM 2.03487.2%1 (3.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Todd Solar Engineering’s installs. No residential system in the file lists a third-party owner name that matches Todd Solar Engineering exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Todd Solar Engineering’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as REC.

In the last 24 months, 1 of Todd Solar Engineering’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Delta Electronics.

In the last 24 months, none of Todd Solar Engineering’s 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC124
Inverter makerDelta Electronics1not in top list
Battery makerEnphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 39 of 39 installs, inverters on 39. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
789098Not found in the CSLB License Master file pulled Nov 4, 202639

License numbers are the ones the utilities recorded on the interconnection applications (39 of 39 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Orange17
San Bernardino8
Riverside7
Los Angeles6
San Diego1

Top cities

CityInstalls
Fullerton7
Norco5
Whittier5
Upland4
Westminster2
Alta Loma1
Brea1
Buena Park1
Chino1
Chino Hills1
Irvine1
La Palma1
Laguna Hills1
Lake Forest1
Long Beach1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TODD SOLAR ENGINEERING25
Todd Solar Engineering14

Common questions

Where does Todd Solar Engineering install solar?

Its installs are spread across 5 counties. The most are in Orange County (17 installs), followed by San Bernardino County (8).

How often does Todd Solar Engineering install batteries with solar?

2.6% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Todd Solar Engineering installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 39 interconnected installs with a tariff recorded (39) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources