TECH ELECTRIC

How many solar installs has TECH ELECTRIC done in California, and which license number is on its installs?

TECH ELECTRIC has 43 residential solar installs interconnected in California, active in the records from 2010 through 2024 (Dec 2, 2010 to Apr 10, 2024), most of them in Los Angeles County (34), San Bernardino County (3) and Orange County (2). CSLB lists license 953946 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
43
Last 24 months
0
Total capacity
347.8 kW DC
Median system size
8 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 41 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Oct 16, 2023
Ownership types recorded
none recorded
First install
Dec 2, 2010
Latest install
Apr 10, 2024
Counties
5
Utilities
SCE 41, SDGE 2
CSLB license
953946

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201100
201210
201300
201400
201500
201600
201700
201800
201900
202000
202100
2022140
2023250
202420
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 43 interconnected installs (2.3% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Oct 16, 2023.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.024.7%not counted
NEM 2.04093.0%0 (0.0%)
Net Billing Tariff12.3%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on TECH ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches TECH ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 43 of TECH ELECTRIC’s 43 installs name a module maker in the “Generator Manufacturer” fields, and most of those (40, 93.0%) used modules recorded as Qcells.

Across all years, 43 of TECH ELECTRIC’s 43 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (23, 53.5%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells040
LG01
SolarWorld01
United Renewable Energy01
Inverter makerEnphase023
SolarEdge014
SunPower03
PV Powered01
Tesla01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 43 of 43 installs, inverters on 43. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
953946Sole owner license (name not shown)CLEARC-10 Electrical ContractorOct 28, 2010Oct 31, 202841

License numbers are the ones the utilities recorded on the interconnection applications (41 of 43 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 953946. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list TECH ELECTRIC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2022Total
unincorporated San Diego County95394622

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles34
San Bernardino3
Orange2
Riverside2
San Diego2

Top cities

CityInstalls
Rowland Heights5
Arcadia4
Monterey Park4
Hacienda Heights3
Rosemead3
San Gabriel3
Walnut3
Chino Hills2
Diamond Bar2
Glendora2
Irvine2
West Covina2
Alhambra1
Chino1
Duarte1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TECH ELECTRIC41
Tech Electric2

Common questions

Where does TECH ELECTRIC install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (34 installs), followed by San Bernardino County (3).

How often does TECH ELECTRIC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many TECH ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 43 interconnected installs (2.3% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.