SunWalk

How many solar installs has SunWalk done in California, and which license number is on its installs?

SunWalk has 115 residential solar installs interconnected in California, active in the records from 2017 through 2019 (May 25, 2017 to Apr 18, 2019), most of them in San Diego County (112) and Orange County (3). The license number recorded on most of its installs, 1005952, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
115
Last 24 months
0
Total capacity
603.7 kW DC
Median system size
4.1 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
1.7% of 115 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 2
First install
May 25, 2017
Latest install
Apr 18, 2019
Counties
2
Utilities
SDGE 115
CSLB license
1005952

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
2017410
2018690
201950
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 115 interconnected installs with a tariff recorded (115) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0115100.0%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2 of SunWalk’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SunWalk exactly.

Third-party owner named on its installsInstalls
Spruce1
Sunwalk Solar1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 112 of SunWalk’s 115 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (40, 35.7%) used modules recorded as Qcells.

Across all years, 115 of SunWalk’s 115 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (109, 94.8%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells040
JinkoSolar038
Hyundai022
LG06
JA Solar05
Inverter makerSolarEdge0109
Enphase05
SMA01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 112 of 115 installs, inverters on 115. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1005952Not found in the CSLB License Master file pulled Nov 4, 2026114

License numbers are the ones the utilities recorded on the interconnection applications (114 of 115 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SunWalk’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20182019Total
unincorporated San Diego County100595216117

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego112
Orange3

Top cities

CityInstalls
San Diego35
Chula Vista12
El Cajon8
Oceanside8
Santee6
La Mesa5
Carlsbad4
Escondido4
Alpine3
Coronado3
Encinitas3
Lakeside3
Ramona3
Rancho Santa Fe3
San Marcos3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SunWalk115

Common questions

Where does SunWalk install solar?

Its installs are spread across 2 counties. The most are in San Diego County (112 installs), followed by Orange County (3).

How often does SunWalk install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many SunWalk installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 115 interconnected installs with a tariff recorded (115) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.