How many solar installs has SunGreen Systems done in California, and which license number is on its installs?

SunGreen Systems has 109 residential solar installs interconnected in California, active in the records from 2009 through 2022 (Sep 14, 2009 to Dec 23, 2022), most of them in Los Angeles County (69), San Bernardino County (14) and Orange County (12). CSLB lists license 935910 (SUNGREEN SYSTEMS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
109
Last 24 months
0
Total capacity
1,445.7 kW DC
Median system size
6 kW DC
With battery storage
2.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
4.3% of 93 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 4
Median battery size
19.2 kWh (3 installs list a capacity)
First install
Sep 14, 2009
Latest install
Dec 23, 2022
Counties
8
Utilities
SCE 106, SDGE 2, PGE 1
CSLB license
935910

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201030
201170
2012110
2013180
2014210
2015110
201680
201730
201830
201940
202070
202121
2022102
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 109 interconnected installs with a tariff recorded (109) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.08174.3%not counted
NEM 2.02825.7%3 (11.5%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 4 of SunGreen Systems’s installs the utility recorded a third-party ownership type: PPA 0, lease 4, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches SunGreen Systems exactly.

Third-party owner named on its installsInstalls
NRG SunCap LLC3
Sunnova Energy Corporation1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 42 of SunGreen Systems’ 109 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (10, 23.8%) used modules recorded as Canadian Solar.

Across all years, 109 of SunGreen Systems’ 109 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (38, 34.9%) used inverters recorded as SolarEdge.

Across all years, 3 of SunGreen Systems’ 109 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (1, 33.3%) used batteries recorded as BYD (Huizhou) Battery.

2 of 3 battery-paired PG&E and SCE installs (66.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar010
Qcells010
Mitsubishi Electric05
SolarWorld03
Panasonic02
Inverter makerSolarEdge038
Enphase034
SMA021
Powercom07
Fronius03
Battery makerBYD (Huizhou) Battery01
LG01
SolarEdge01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 42 of 109 installs, inverters on 109. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SunGreen Systems as developer on 6 battery storage projects and as installer on 8 (6 name it as both), 8 projects in all with 2,023 kWh of storage. 4 have the status Paid, with $184,713 in current incentive allocations. Applications were received from Jun 30, 2014 to Nov 22, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid4482$184,713
PBI in Process21,529$352,310
Cancelled213$11,265

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage21,529$352,3100$0
Non-Residential Storage Equity2446$178,4002$178,400
Small Residential Storage236$6,3132$6,313
Not stated213$11,2650$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
935910SUNGREEN SYSTEMS INC (Corporation)CLEARB General Building ContractorJul 28, 2009Jul 31, 2027108

License numbers are the ones the utilities recorded on the interconnection applications (108 of 109 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 935910. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles69
San Bernardino14
Orange12
Riverside9
Ventura2
San Diego1
San Mateo1
Santa Barbara1

Top cities

CityInstalls
Arcadia8
Diamond Bar7
Hacienda Heights7
Corona6
Rancho Cucamonga5
San Marino4
Walnut4
Chino Hills3
Cypress3
Santa Monica3
West Covina3
Altadena2
Canyon Country2
Corona del Mar2
Glendora2

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUNGREEN SYSTEMS66
SUNGREEN SYSTEMS INC26
SunGreen Systems14
SunGreen Systems Inc2
SunGreen Systems, Inc.1

Common questions

Where does SunGreen Systems install solar?

Its installs are spread across 8 counties. The most are in Los Angeles County (69 installs), followed by San Bernardino County (14).

How often does SunGreen Systems install batteries with solar?

2.8% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SunGreen Systems installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 109 interconnected installs with a tariff recorded (109) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.