SUN'S FREE

How many solar installs has SUN'S FREE done in California, and which license number is on its installs?

SUN'S FREE has 49 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 17, 2019 to Apr 30, 2026), most of them in Alameda County (22), Marin County (8) and San Francisco County (8). CSLB lists license 917560 (SUN'S FREE) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
49
Last 24 months
12
Total capacity
360.3 kW DC
Median system size
7.1 kW DC
With battery storage
53.1% all time; 66.7% last 24 months
Third-party owned
0.0% of 49 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
15 installs, latest Apr 16, 2026
Ownership types recorded
none recorded
Median battery size
18.2 kWh (10 installs list a capacity)
First install
Oct 17, 2019
Latest install
Apr 30, 2026
Counties
6
Utilities
PGE 49
CSLB license
917560

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201941
202055
202154
202254
2023152
202442
202564
2026 (through Aug 31, 2026)54

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

15 of its 49 interconnected installs (30.6% of the 49 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 60.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.024.1%not counted
NEM 2.03265.3%15 (46.9%)
Net Billing Tariff1530.6%9 (60.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SUN'S FREE’s installs. No residential system in the file lists a third-party owner name that matches SUN'S FREE exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 11 of SUN'S FREE’s 12 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4, 36.4%) used modules recorded as REC.

In the last 24 months, 12 of SUN'S FREE’s 12 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 66.7%) used inverters recorded as Enphase.

In the last 24 months, 6 of SUN'S FREE’s 12 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 66.7%) used batteries recorded as Tesla.

12 of 26 battery-paired PG&E and SCE installs (46.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC45
Qcells315
Hyundai2not in top list
Aptos Solar1not in top list
EG41not in top list
Inverter makerEnphase833
Tesla58
PointGuard Energy Inc.2not in top list
Sol-Ark1not in top list
SolarEdge17
Battery makerTesla46
PointGuard Energy Inc.22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 41 of 49 installs, inverters on 49. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
917560SUN'S FREE (Corporation)CLEARC-10 Electrical ContractorJun 13, 2008Jun 30, 202849

License numbers are the ones the utilities recorded on the interconnection applications (49 of 49 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 917560. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SUN'S FREE’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202021202220232025Total
City and County of San Francisco917560210131311
unincorporated Marin County91756000200002

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Alameda22
Marin8
San Francisco8
Contra Costa7
San Mateo3
Santa Clara1

Top cities

CityInstalls
Oakland14
San Francisco8
Berkeley5
Lafayette4
Mill Valley3
San Rafael3
Alamo1
Albany1
Atherton1
Belvedere1
Castro Valley1
Danville1
Hillsborough1
Morgan Hill1
Pacifica1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SUN'S FREE49

Common questions

Where does SUN'S FREE install solar?

Its installs are spread across 6 counties. The most are in Alameda County (22 installs), followed by Marin County (8).

How often does SUN'S FREE install batteries with solar?

53.1% of its interconnected solar installs include battery storage across all years, and 66.7% in the last 24 months (8 of 12).

How many SUN'S FREE installs are under NEM 3.0 (the Net Billing Tariff)?

15 of its 49 interconnected installs (30.6% of the 49 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 60.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.