SOUTH WEST DEVELOPMENT INC
How many solar installs has SOUTH WEST DEVELOPMENT INC done in California, and which license number is on its installs?
SOUTH WEST DEVELOPMENT INC has 34 residential solar installs interconnected in California, active in the records from 2020 through 2023 (May 28, 2020 to Nov 27, 2023), most of them in Los Angeles County (17), San Bernardino County (8) and Orange County (4). CSLB lists license 1031232 (SOUTH WEST DEVELOPMENT INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-36, expires Sep 30, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 34
- Last 24 months
- 0
- Total capacity
- 199.6 kW DC
- Median system size
- 5.4 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 0.0% of 34 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 3 installs, latest Nov 27, 2023
- Ownership types recorded
- none recorded
- First install
- May 28, 2020
- Latest install
- Nov 27, 2023
- Counties
- 5
- Utilities
- SCE 33, PGE 1
- CSLB license
- 1031232
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2020 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2020 | 1 | 0 |
| 2021 | 0 | 0 |
| 2022 | 13 | 0 |
| 2023 | 20 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
3 of its 34 interconnected installs (8.8% of the 34 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Nov 27, 2023.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 31 | 91.2% | 0 (0.0%) |
| Net Billing Tariff | 3 | 8.8% | 0 (0.0%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on SOUTH WEST DEVELOPMENT INC’s installs. No residential system in the file lists a third-party owner name that matches SOUTH WEST DEVELOPMENT INC exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 34 of SOUTH WEST DEVELOPMENT INC’s 34 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 17.6%) used modules recorded as Canadian Solar.
Across all years, 34 of SOUTH WEST DEVELOPMENT INC’s 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (14, 41.2%) used inverters recorded as Enphase.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Canadian Solar | 0 | 6 |
| Heliene | 0 | 6 | |
| Qcells | 0 | 5 | |
| LG | 0 | 4 | |
| Silfab | 0 | 3 | |
| Inverter maker | Enphase | 0 | 14 |
| SolarEdge | 0 | 11 | |
| Growatt | 0 | 3 | |
| SunPower | 0 | 3 | |
| Delta Electronics | 0 | 2 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 34 of 34 installs, inverters on 34. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1031232 | SOUTH WEST DEVELOPMENT INC (Corporation) | CLEAR, Pending IFS | B General Building Contractor; C-10 Electrical Contractor; C-36 | Sep 22, 2017 | Sep 30, 2027 | 34 |
License numbers are the ones the utilities recorded on the interconnection applications (34 of 34 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The License Master file lists a pending suspension date of Nov 23, 2026 for license 1031232. A pending date is CSLB’s scheduled action if the underlying requirement is not met; it is not a finding of wrongdoing.
What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.
Counties
| County | Installs |
|---|---|
| Los Angeles | 17 |
| San Bernardino | 8 |
| Orange | 4 |
| Ventura | 4 |
| Santa Clara | 1 |
Top cities
| City | Installs |
|---|---|
| Los Angeles | 3 |
| Altadena | 2 |
| Chino Hills | 2 |
| Simi Valley | 2 |
| Carson | 1 |
| Cerritos | 1 |
| Chino | 1 |
| Claremont | 1 |
| Compton | 1 |
| Costa Mesa | 1 |
| Downey | 1 |
| El Segundo | 1 |
| Fontana | 1 |
| Garden Grove | 1 |
| Long Beach | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| SOUTH WEST DEVELOPMENT INC | 34 |
Common questions
Where does SOUTH WEST DEVELOPMENT INC install solar?
Its installs are spread across 5 counties. The most are in Los Angeles County (17 installs), followed by San Bernardino County (8).
How often does SOUTH WEST DEVELOPMENT INC install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many SOUTH WEST DEVELOPMENT INC installs are under NEM 3.0 (the Net Billing Tariff)?
3 of its 34 interconnected installs (8.8% of the 34 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.