Solar Center, INC

How many solar installs has Solar Center, INC done in California, and which license number is on its installs?

Solar Center, INC has 62 residential solar installs interconnected in California, active in the records from 2009 through 2019 (Jul 17, 2009 to Dec 19, 2019), most of them in Santa Clara County (40), San Mateo County (15) and Alameda County (2). CSLB lists license 488066 (SOLAR CENTER INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-17, C-20, C-46, D-12, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
62
Last 24 months
0
Total capacity
326.8 kW DC
Median system size
4.8 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
1.7% of 59 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 1
First install
Jul 17, 2009
Latest install
Dec 19, 2019
Counties
7
Utilities
PGE 58, SCE 2, SDGE 2
CSLB license
488066

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200920
201050
201100
201240
201350
201430
201570
201690
201780
201870
2019120
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 62 interconnected installs with a tariff recorded (62) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03556.5%not counted
NEM 2.02743.5%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of Solar Center, INC’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Solar Center, INC exactly.

Third-party owner named on its installsInstalls
SUN POWER1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 60 of Solar Center, INC’s 62 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (21, 35.0%) used modules recorded as LG.

Across all years, 62 of Solar Center, INC’s 62 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (46, 74.2%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG021
SolarWorld020
Trina Solar010
SunPower07
Sharp02
Inverter makerSolarEdge046
SMA06
SunPower06
Enphase02
ABB01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 60 of 62 installs, inverters on 62. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
488066SOLAR CENTER INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-17; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar Contractor; D-12Mar 6, 1986Mar 31, 202840

License numbers are the ones the utilities recorded on the interconnection applications (44 of 62 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 488066. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Clara40
San Mateo15
Alameda2
San Bernardino2
Orange1
San Diego1
San Francisco1

Top cities

CityInstalls
Sunnyvale13
San Jose11
Cupertino6
San Mateo6
Redwood City5
Los Altos3
Castro Valley2
Los Gatos2
Stanford2
Belmont1
Campbell1
Foster City1
Las Flores1
Los Altos Hills1
Menlo Park1

Names as recorded by the utilities

The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Solar Center, INC18
Solar Center INC15
Solar Center6
Solar Center, Inc6
Solar Center Inc5
SOLAR CENTER INC5
Solar Center, Inc.4
SOLAR CENTER2
Solar Center Inc.1

Common questions

Where does Solar Center, INC install solar?

Its installs are spread across 7 counties. The most are in Santa Clara County (40 installs), followed by San Mateo County (15).

How often does Solar Center, INC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Solar Center, INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 62 interconnected installs with a tariff recorded (62) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.