Sky Power Systems

How many solar installs has Sky Power Systems done in California, and which license number is on its installs?

Sky Power Systems has 1,429 residential solar installs interconnected in California, active in the records from 2002 through 2026 (Jul 25, 2002 to Apr 14, 2026), most of them in Contra Costa County (857), Alameda County (419) and Santa Clara County (72). The license number recorded on most of its installs, 800947, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,429
Last 24 months
7
Total capacity
10,702.9 kW DC
Median system size
6.6 kW DC
With battery storage
1.3% all time; 0.0% last 24 months
Third-party owned
0.2% of 1,429 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
8 installs, latest Oct 8, 2024
Ownership types recorded
lease 3
Median battery size
14 kWh (2 installs list a capacity)
First install
Jul 25, 2002
Latest install
Apr 14, 2026
Counties
11
Utilities
PGE 1,429
CSLB license
800947

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2002 to 2026

YearInstalls interconnectedWith battery storage
200230
2003170
2004240
2005100
2006220
2007280
2008190
2009360
2010260
2011460
2012850
2013970
20141170
20151471
20161210
20171040
20181021
20191471
2020441
2021803
2022794
2023637
202461
202550
2026 (through Aug 31, 2026)10

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

8 of its 1,429 interconnected installs (0.6% of the 1,429 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Oct 8, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.080956.6%not counted
NEM 2.061242.8%14 (2.3%)
Net Billing Tariff80.6%4 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 3 of Sky Power Systems’s installs the utility recorded a third-party ownership type: PPA 0, lease 3, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Sky Power Systems exactly.

Third-party owner named on its installsInstalls
SunPower2
SunPower Capital, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 5 of Sky Power Systems’ 7 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used modules recorded as REC.

In the last 24 months, 7 of Sky Power Systems’ 7 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of Sky Power Systems’ 7 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

13 of 19 battery-paired PG&E and SCE installs (68.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC5not in top list
Inverter makerEnphase7140
SunPower1514
Xantrex Technology Inc.1not in top list
Battery makerTesla08
LG04
SunPower01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,393 of 1,429 installs, inverters on 1,429. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Sky Power Systems as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 13 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Feb 24, 2021 to Feb 24, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
RRF Rejected113$2,320

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Not stated113$2,3200$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
800947Not found in the CSLB License Master file pulled Nov 4, 2026972

License numbers are the ones the utilities recorded on the interconnection applications (972 of 1,429 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Contra Costa857
Alameda419
Santa Clara72
San Mateo29
Solano27
San Joaquin13
Stanislaus4
Marin3
San Francisco3
Napa1
Sonoma1

Top cities

CityInstalls
Danville228
Pleasanton138
San Ramon136
Livermore111
Alamo101
Walnut Creek93
Lafayette51
San Jose44
Concord41
Oakland41
Fremont33
Dublin31
Martinez29
Orinda29
Brentwood28

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sky Power Systems1,088
SKY POWER SYSTEMS335
Sky Power systems3
Sky Power Systems, Inc.2
Sky power systems1

Common questions

Where does Sky Power Systems install solar?

Its installs are spread across 11 counties. The most are in Contra Costa County (857 installs), followed by Alameda County (419).

How often does Sky Power Systems install batteries with solar?

1.3% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 7).

How many Sky Power Systems installs are under NEM 3.0 (the Net Billing Tariff)?

8 of its 1,429 interconnected installs (0.6% of the 1,429 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.