SATER ELECTRIC LLC

How many solar installs has SATER ELECTRIC LLC done in California, and which license number is on its installs?

SATER ELECTRIC LLC has 194 residential solar installs interconnected in California, active in the records from 2021 through 2024 (Feb 11, 2021 to Dec 31, 2024), most of them in Orange County (46), Riverside County (40) and Los Angeles County (37). The license number recorded on most of its installs, 976252, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
194
Last 24 months
2
Total capacity
1,545.5 kW DC
Median system size
7.6 kW DC
With battery storage
4.4% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
6.7% of 194 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest Dec 31, 2024
Ownership types recorded
lease 13
Median battery size
10.1 kWh (8 installs list a capacity)
First install
Feb 11, 2021
Latest install
Dec 31, 2024
Counties
6
Utilities
SCE 181, SDGE 13
CSLB license
976252

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021431
2022825
2023562
2024130
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 194 interconnected installs (1.5% of the 194 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 31, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.019198.5%8 (4.5%)
Net Billing Tariff31.5%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 13 of SATER ELECTRIC LLC’s installs the utility recorded a third-party ownership type: PPA 0, lease 13, prepaid lease 0, other 0. Across all installers, 3 residential systems list a third-party owner name that matches SATER ELECTRIC LLC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Powur PBC7
SUNNOVA3
SATER ELECTRIC LLC2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of SATER ELECTRIC LLC’s 2 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as Qcells.

In the last 24 months, 2 of SATER ELECTRIC LLC’s 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of SATER ELECTRIC LLC’s 2 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

8 of 8 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2139
Inverter makerEnphase284
Battery makerEnphase08

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 183 of 194 installs, inverters on 194. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SATER ELECTRIC LLC as developer on 2 battery storage projects and as installer on 3 (2 name it as both), 3 projects in all with 29 kWh of storage. 3 have the status Paid, with $5,135 in current incentive allocations. Applications were received from Jun 29, 2022 to Aug 10, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid329$5,135

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage329$5,1353$5,135

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
976252Not found in the CSLB License Master file pulled Nov 4, 2026194

License numbers are the ones the utilities recorded on the interconnection applications (194 of 194 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SATER ELECTRIC LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
unincorporated San Diego County97625211

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Orange46
Riverside40
Los Angeles37
San Bernardino36
Kern27
San Diego8

Top cities

CityInstalls
Tehachapi27
Corona9
Irvine7
Hesperia6
Monterey Park6
Murrieta6
Menifee5
Victorville5
Fullerton4
Costa Mesa3
Cypress3
Diamond Bar3
Eastvale3
Fontana3
Lake Elsinore3

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SATER ELECTRIC LLC177
Sater Electric13
SATER ELECTRIC4

Common questions

Where does SATER ELECTRIC LLC install solar?

Its installs are spread across 6 counties. The most are in Orange County (46 installs), followed by Riverside County (40).

How often does SATER ELECTRIC LLC install batteries with solar?

4.4% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 2). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SATER ELECTRIC LLC installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 194 interconnected installs (1.5% of the 194 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.