Power Up

How many solar installs has Power Up done in California, and which license number is on its installs?

Power Up has 98 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Mar 19, 2024 to Aug 13, 2026), most of them in San Diego County (95) and Orange County (3). CSLB lists license 1113778 (POWER UP SOLUTIONS LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
98
Last 24 months
87
Total capacity
547.8 kW DC
Median system size
4.9 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
88.8% of 80 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
80 installs, latest Aug 13, 2026
Ownership types recorded
PPA 71
First install
Mar 19, 2024
Latest install
Aug 13, 2026
Counties
2
Utilities
SDGE 98
CSLB license
1113778

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
2024190
2025420
2026 (through Aug 31, 2026)370

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

80 of its 98 interconnected installs (100.0% of the 80 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 13, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.000.0%0
Net Billing Tariff80100.0%not recorded
Not recorded18

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 71 of Power Up’s installs the utility recorded a third-party ownership type: PPA 71, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Power Up exactly.

Third-party owner named on its installsInstalls
POWER UP SOLUTIONS L39
EverBright18
POWER UP SOLUTIONS14

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 66 of Power Up’s 87 installs name a module maker in the “Generator Manufacturer” fields, and most of those (44, 66.7%) used modules recorded as Qcells.

In the last 24 months, 69 of Power Up’s 87 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (55, 79.7%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells4446
LONGi1313
JA Solar44
Mission Solar33
Canadian Solar210
Inverter makerEnphase5566
Tesla1515
SolarEdge12

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 76 of 98 installs, inverters on 80. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1113778POWER UP SOLUTIONS LLC (Limited Liability)CLEARC-10 Electrical ContractorDec 12, 2023Dec 31, 202780

License numbers are the ones the utilities recorded on the interconnection applications (80 of 98 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1113778. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Power Up’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202420252026Total
unincorporated San Diego County1113778362332

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego95
Orange3

Top cities

CityInstalls
San Diego48
Chula Vista8
El Cajon4
Spring Valley4
La Mesa2
National City2
Bonita1
Carlsbad1
Imperial Beach1
Laguna Niguel1
Lakeside1
Lemon Grove1
Oceanside1
Poway1
Ramona1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Power Up98

Common questions

Where does Power Up install solar?

Its installs are spread across 2 counties. The most are in San Diego County (95 installs), followed by Orange County (3).

How often does Power Up install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many Power Up installs are under NEM 3.0 (the Net Billing Tariff)?

80 of its 98 interconnected installs (100.0% of the 80 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.