Potere Solar

How many solar installs has Potere Solar done in California, and which license number is on its installs?

Potere Solar has 218 residential solar installs interconnected in California, active in the records from 2010 through 2016 (May 21, 2010 to Jul 13, 2016), most of them in Riverside County (203), San Bernardino County (12) and Los Angeles County (1). The license number recorded on most of its installs, 941529, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
218
Last 24 months
0
Total capacity
1,924.2 kW DC
Median system size
8.3 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
59.9% of 147 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 6, lease 82
First install
May 21, 2010
Latest install
Jul 13, 2016
Counties
5
Utilities
SCE 217, SDGE 1
CSLB license
941529

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201020
201130
2012180
2013440
2014450
2015810
2016250
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 218 interconnected installs with a tariff recorded (218) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0218100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 88 of Potere Solar’s installs the utility recorded a third-party ownership type: PPA 6, lease 82, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Potere Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
SunPower28
SunPower Capital LLC25
NRG SunCap LLC14
Raydius Energy LLC11
Kilowatt Systems, LLC3

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 62 of Potere Solar’s 218 installs name a module maker in the “Generator Manufacturer” fields, and most of those (45, 72.6%) used modules recorded as SunPower.

Across all years, 218 of Potere Solar’s 218 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (78, 35.8%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower045
SolarWorld010
LG06
Hyundai01
Inverter makerSMA078
Enphase046
SunPower045
Fronius026
ABB010

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 62 of 218 installs, inverters on 218. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
941529Not found in the CSLB License Master file pulled Nov 4, 2026217

License numbers are the ones the utilities recorded on the interconnection applications (217 of 218 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Riverside203
San Bernardino12
Los Angeles1
Orange1
Tulare1

Top cities

CityInstalls
Palm Springs75
Cathedral City39
Palm Desert39
Rancho Mirage37
Desert Hot Springs7
Rancho Cucamonga5
Indian Wells3
Joshua Tree2
Borrego Springs1
Cherry Valley1
Chino Hills1
Moreno Valley1
North Palm Springs1
Ontario1
San Bernardino1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
POTERE SOLAR157
Potere Solar61

Common questions

Where does Potere Solar install solar?

Its installs are spread across 5 counties. The most are in Riverside County (203 installs), followed by San Bernardino County (12).

How often does Potere Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Potere Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 218 interconnected installs with a tariff recorded (218) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.