PerkSolar has 516 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Apr 29, 2013 to Jul 1, 2026), most of them in San Diego County (508) and Orange County (8). CSLB lists license 920995 (PERK SOLAR ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
516
Last 24 months
34
Total capacity
3,929.7 kW DC
Median system size
6.8 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 439 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
16 installs, latest Jul 1, 2026
Ownership types recorded
none recorded
First install
Apr 29, 2013
Latest install
Jul 1, 2026
Counties
2
Utilities
SDGE 516
CSLB license
920995

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
2013150
2014470
2015610
2016700
2017280
2018250
2019300
2020340
2021370
2022450
2023640
2024290
2025250
2026 (through Aug 31, 2026)60

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

16 of its 516 interconnected installs (3.1% of the 516 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jul 1, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.016832.6%not counted
NEM 2.033264.3%not recorded
Net Billing Tariff163.1%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on PerkSolar’s installs. No residential system in the file lists a third-party owner name that matches PerkSolar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 32 of PerkSolar’s 34 installs name a module maker in the “Generator Manufacturer” fields, and most of those (22, 68.8%) used modules recorded as Qcells.

In the last 24 months, 34 of PerkSolar’s 34 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (20, 58.8%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells22207
LONGi5not in top list
HDHYUNDAIENERGYSOLUTIONSCO.,LTD.3not in top list
REC1not in top list
SEGSolarInc.1not in top list
Inverter makerEnphase20434
Tesla1418

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 500 of 516 installs, inverters on 516. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
920995PERK SOLAR ELECTRIC (Corporation)CLEARC-10 Electrical ContractorAug 19, 2008Aug 31, 2028353

License numbers are the ones the utilities recorded on the interconnection applications (354 of 516 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 920995. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list PerkSolar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County920995910815171645286

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego508
Orange8

Top cities

CityInstalls
San Diego168
El Cajon66
La Mesa28
Santee23
Encinitas22
Coronado20
Escondido19
Carlsbad17
Chula Vista15
Alpine13
San Marcos12
Lakeside11
Bonita10
Del Mar10
La Jolla10

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PerkSolar516

Common questions

Where does PerkSolar install solar?

Its installs are spread across 2 counties. The most are in San Diego County (508 installs), followed by Orange County (8).

How often does PerkSolar install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many PerkSolar installs are under NEM 3.0 (the Net Billing Tariff)?

16 of its 516 interconnected installs (3.1% of the 516 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.