Optimum Solar Power
How many solar installs has Optimum Solar Power done in California, and which license number is on its installs?
Optimum Solar Power has 36 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Jun 8, 2017 to Apr 23, 2026), most of them in Riverside County (17), Orange County (8) and Los Angeles County (5). CSLB lists license 1024381 (OPTIMUM SOLAR POWER INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, C-10, C-46, expires Jan 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 36
- Last 24 months
- 3
- Total capacity
- 348.7 kW DC
- Median system size
- 8.6 kW DC
- With battery storage
- 8.3% all time; 100.0% last 24 months
- Third-party owned
- 0.0% of 36 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 3 installs, latest Apr 23, 2026
- Ownership types recorded
- none recorded
- Median battery size
- 20.5 kWh (3 installs list a capacity)
- First install
- Jun 8, 2017
- Latest install
- Apr 23, 2026
- Counties
- 5
- Utilities
- SCE 34, PGE 2
- CSLB license
- 1024381
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2017 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2017 | 6 | 0 |
| 2018 | 12 | 0 |
| 2019 | 4 | 0 |
| 2020 | 0 | 0 |
| 2021 | 3 | 0 |
| 2022 | 5 | 0 |
| 2023 | 3 | 0 |
| 2024 | 0 | 0 |
| 2025 | 2 | 2 |
| 2026 (through Aug 31, 2026) | 1 | 1 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
3 of its 36 interconnected installs (8.3% of the 36 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 23, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 2 | 5.6% | not counted |
| NEM 2.0 | 31 | 86.1% | 0 (0.0%) |
| Net Billing Tariff | 3 | 8.3% | 3 (100.0%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Optimum Solar Power’s installs. No residential system in the file lists a third-party owner name that matches Optimum Solar Power exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 3 of Optimum Solar Power’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used modules recorded as Deye.
In the last 24 months, 3 of Optimum Solar Power’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 66.7%) used inverters recorded as Sol-Ark.
0 of 3 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Deye | 2 | not in top list |
| Trina Solar | 2 | not in top list | |
| Canadian Solar | 1 | 4 | |
| GoodWe Technologies Co., Ltd. | 1 | not in top list | |
| Inverter maker | Sol-Ark | 2 | 2 |
| GoodWe Technologies Co., Ltd. | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 35 of 36 installs, inverters on 36. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1024381 | OPTIMUM SOLAR POWER INC (Corporation) | CLEAR | A General Engineering Contractor; C-10 Electrical Contractor; C-46 Solar Contractor | Mar 7, 2017 | Jan 31, 2028 | 35 |
License numbers are the ones the utilities recorded on the interconnection applications (35 of 36 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1024381. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list Optimum Solar Power’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2021 | 2025 | Total |
|---|---|---|---|---|
| unincorporated San Diego County | 1024381 | 1 | 1 | 2 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Counties
| County | Installs |
|---|---|
| Riverside | 17 |
| Orange | 8 |
| Los Angeles | 5 |
| San Bernardino | 4 |
| Fresno | 2 |
Top cities
| City | Installs |
|---|---|
| Corona | 8 |
| Riverside | 3 |
| Highland | 2 |
| Perris | 2 |
| Alhambra | 1 |
| Aliso Viejo | 1 |
| Alta Loma | 1 |
| Buena Park | 1 |
| Clovis | 1 |
| Fountain Valley | 1 |
| Fresno | 1 |
| Garden Grove | 1 |
| Glendora | 1 |
| La Verne | 1 |
| Lake Elsinore | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| OPTIMUM SOLAR POWER INC | 24 |
| OPTIMUM SOLAR POWER | 6 |
| Optimum Solar Power | 4 |
| optimum solar power | 1 |
| optimum solar power inc | 1 |
Common questions
Where does Optimum Solar Power install solar?
Its installs are spread across 5 counties. The most are in Riverside County (17 installs), followed by Orange County (8).
How often does Optimum Solar Power install batteries with solar?
8.3% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (3 of 3).
How many Optimum Solar Power installs are under NEM 3.0 (the Net Billing Tariff)?
3 of its 36 interconnected installs (8.3% of the 36 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.