Metro RF

How many solar installs has Metro RF done in California, and which license number is on its installs?

Metro RF has 39 residential solar installs interconnected in California, active in the records from 2015 through 2016 (Nov 3, 2015 to Jul 26, 2016), most of them in San Bernardino County (15), Los Angeles County (10) and Riverside County (8). CSLB lists license 895236 (METRO RF SERVICES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-7, C-10, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
39
Last 24 months
0
Total capacity
273.4 kW DC
Median system size
6.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
61.5% of 39 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 8, lease 16
First install
Nov 3, 2015
Latest install
Jul 26, 2016
Counties
4
Utilities
SCE 39
CSLB license
895236

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
2015110
2016280
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 39 interconnected installs with a tariff recorded (39) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.039100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 24 of Metro RF’s installs the utility recorded a third-party ownership type: PPA 8, lease 16, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Metro RF exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
METRORF12
Sunrun8
METOR RF1
METRO RF1
Metro RF Services1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 39 of Metro RF’s 39 installs name a module maker in the “Generator Manufacturer” fields, and most of those (24, 61.5%) used modules recorded as SunPower.

Across all years, 39 of Metro RF’s 39 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (29, 74.4%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower024
REC04
SolarWorld04
Qcells03
Renesola America03
Inverter makerSMA029
SolarEdge08
Enphase02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 39 of 39 installs, inverters on 39. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
895236METRO RF SERVICES INC (Corporation)CLEARB General Building Contractor; C-7; C-10 Electrical ContractorApr 25, 2007Apr 30, 202725

License numbers are the ones the utilities recorded on the interconnection applications (29 of 39 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 895236. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
San Bernardino15
Los Angeles10
Riverside8
Orange6

Top cities

CityInstalls
San Bernardino3
Twentynine Palms3
Apple Valley2
Moreno Valley2
Riverside2
Calimesa1
Chino1
Corona1
Diamond Bar1
Downey1
Fullerton1
Garden Grove1
Hacienda Heights1
Highland1
Joshua Tree1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Metro RF36
Metro RF, Inc.3

Common questions

Where does Metro RF install solar?

Its installs are spread across 4 counties. The most are in San Bernardino County (15 installs), followed by Los Angeles County (10).

How often does Metro RF install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Metro RF installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 39 interconnected installs with a tariff recorded (39) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.