KWH CONSTRUCTION

How many solar installs has KWH CONSTRUCTION done in California, and which license number is on its installs?

KWH CONSTRUCTION has 55 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Jan 12, 2021 to Feb 20, 2026), most of them in Santa Clara County (41), San Mateo County (4) and San Benito County (3). CSLB lists license 1068858 (KWH CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
55
Last 24 months
9
Total capacity
453.9 kW DC
Median system size
8.1 kW DC
With battery storage
25.5% all time; 88.9% last 24 months
Third-party owned
0.0% of 55 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
10 installs, latest Feb 20, 2026
Ownership types recorded
none recorded
Median battery size
1 kWh (1 installs list a capacity)
First install
Jan 12, 2021
Latest install
Feb 20, 2026
Counties
8
Utilities
PGE 55
CSLB license
1068858

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021141
2022123
2023181
202476
202532
2026 (through Aug 31, 2026)11

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

10 of its 55 interconnected installs (18.2% of the 55 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.0% of those include battery storage. The latest Net Billing Tariff install was approved Feb 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04581.8%5 (11.1%)
Net Billing Tariff1018.2%9 (90.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on KWH CONSTRUCTION’s installs. No residential system in the file lists a third-party owner name that matches KWH CONSTRUCTION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9 of KWH CONSTRUCTION’s 9 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (3, 33.3%) used modules recorded as REC.

In the last 24 months, 9 of KWH CONSTRUCTION’s 9 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 66.7%) used inverters recorded as Tesla.

In the last 24 months, 8 of KWH CONSTRUCTION’s 9 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (6, 75.0%) used batteries recorded as Tesla.

13 of 14 battery-paired PG&E and SCE installs (92.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC35
JA Solar22
SunPower22
Hyundai1not in top list
Waaree1not in top list
Inverter makerTesla66
Enphase248
SunPower11
Battery makerTesla66
Enphase27

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 50 of 55 installs, inverters on 55. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1068858KWH CONSTRUCTION (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorSep 15, 2020Sep 30, 202855

License numbers are the ones the utilities recorded on the interconnection applications (55 of 55 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1068858. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Clara41
San Mateo4
San Benito3
Alameda2
Monterey2
Fresno1
Merced1
San Joaquin1

Top cities

CityInstalls
San Jose13
Gilroy11
San Martin6
Morgan Hill4
Hollister3
Los Gatos3
Fremont2
Salinas2
Sunnyvale2
Clovis1
La Honda1
Los Banos1
Mountain View1
Redwood City1
San Mateo1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
KWH CONSTRUCTION55

Common questions

Where does KWH CONSTRUCTION install solar?

Its installs are spread across 8 counties. The most are in Santa Clara County (41 installs), followed by San Mateo County (4).

How often does KWH CONSTRUCTION install batteries with solar?

25.5% of its interconnected solar installs include battery storage across all years, and 88.9% in the last 24 months (8 of 9).

How many KWH CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

10 of its 55 interconnected installs (18.2% of the 55 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.