J I ELECTRIC

How many solar installs has J I ELECTRIC done in California, and which license number is on its installs?

J I ELECTRIC has 98 residential solar installs interconnected in California, active in the records from 2021 through 2025 (Jan 4, 2021 to Jul 21, 2025), most of them in San Bernardino County (51), Los Angeles County (32) and Riverside County (9). CSLB lists license 1050414 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
98
Last 24 months
1
Total capacity
809.5 kW DC
Median system size
8.1 kW DC
With battery storage
1.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 98 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Jul 21, 2025
Ownership types recorded
none recorded
Median battery size
9.8 kWh (1 installs list a capacity)
First install
Jan 4, 2021
Latest install
Jul 21, 2025
Counties
5
Utilities
SCE 97, PGE 1
CSLB license
1050414

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021280
2022661
202330
202400
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 98 interconnected installs (1.0% of the 98 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 21, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.09799.0%1 (1.0%)
Net Billing Tariff11.0%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on J I ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches J I ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of J I ELECTRIC’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Aptos Solar.

In the last 24 months, 1 of J I ELECTRIC’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of J I ELECTRIC’s 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar1not in top list
Inverter makerEnphase141
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 80 of 98 installs, inverters on 98. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1050414Sole owner license (name not shown)CLEARC-10 Electrical ContractorFeb 20, 2019Jan 31, 202898

License numbers are the ones the utilities recorded on the interconnection applications (98 of 98 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1050414. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list J I ELECTRIC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20212022Total
unincorporated San Diego County1050414235

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Bernardino51
Los Angeles32
Riverside9
Orange5
Stanislaus1

Top cities

CityInstalls
Fontana11
San Bernardino9
Victorville5
Alta Loma4
Glendora4
Rialto4
West Covina4
Barstow3
Claremont3
Diamond Bar3
Pinon Hills3
Covina2
Fullerton2
La Puente2
La Verne2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
J I ELECTRIC98

Common questions

Where does J I ELECTRIC install solar?

Its installs are spread across 5 counties. The most are in San Bernardino County (51 installs), followed by Los Angeles County (32).

How often does J I ELECTRIC install batteries with solar?

1.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many J I ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 98 interconnected installs (1.0% of the 98 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.