How many solar installs has Indigo Solar done in California, and which license number is on its installs?

Indigo Solar has 83 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Jul 14, 2022 to Aug 3, 2026), most of them in Los Angeles County (28), San Bernardino County (21) and San Diego County (12). CSLB lists license 1086834 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
83
Last 24 months
67
Total capacity
548.1 kW DC
Median system size
6.3 kW DC
With battery storage
7.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 8.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.2% of 83 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
74 installs, latest Aug 3, 2026
Ownership types recorded
lease 1
Median battery size
5 kWh (5 installs list a capacity)
First install
Jul 14, 2022
Latest install
Aug 3, 2026
Counties
9
Utilities
SCE 69, SDGE 13, PGE 1
CSLB license
1086834

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202220
202310
2024280
2025431
2026 (through Aug 31, 2026)94

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

74 of its 83 interconnected installs (89.2% of the 83 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 7.7% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 3, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.0910.8%0 (0.0%)
Net Billing Tariff7489.2%5 (7.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 1 of Indigo Solar’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Indigo Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Indigo Solar1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 66 of Indigo Solar’s 67 installs name a module maker in the “Generator Manufacturer” fields, and most of those (37, 56.1%) used modules recorded as Canadian Solar.

In the last 24 months, 67 of Indigo Solar’s 67 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (47, 70.1%) used inverters recorded as SolarEdge.

In the last 24 months, 5 of Indigo Solar’s 67 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (5, 100.0%) used batteries recorded as Enphase.

5 of 5 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar3744
JinkoSolar1214
Qcells56
mSolar44
Silfab35
Inverter makerSolarEdge4760
Enphase2023
AP Systems11
Battery makerEnphase55

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 82 of 83 installs, inverters on 83. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1086834Sole owner license (name not shown)CLEARC-46 Solar ContractorFeb 1, 2022Feb 29, 202883

License numbers are the ones the utilities recorded on the interconnection applications (83 of 83 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1086834. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Indigo Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202320252026Total
unincorporated San Diego County10868342215

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles28
San Bernardino21
San Diego12
Riverside10
Orange6
Kern2
Tulare2
Monterey1
Ventura1

Top cities

CityInstalls
Compton7
Long Beach5
San Bernardino5
San Diego4
Chino3
Corona3
Pico Rivera3
Victorville3
Barstow2
Hemet2
Hesperia2
Irvine2
La Puente2
Lake Elsinore2
Lemon Grove2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
INDIGO SOLAR70
Indigo Solar13

Common questions

Where does Indigo Solar install solar?

Its installs are spread across 9 counties. The most are in Los Angeles County (28 installs), followed by San Bernardino County (21).

How often does Indigo Solar install batteries with solar?

7.1% of its interconnected solar installs include battery storage across all years, and 8.9% in the last 24 months (5 of 56). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Indigo Solar installs are under NEM 3.0 (the Net Billing Tariff)?

74 of its 83 interconnected installs (89.2% of the 83 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 7.7% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.