GSP (GOT SOLAR POWER)

How many solar installs has GSP (GOT SOLAR POWER) done in California, and which license number is on its installs?

GSP (GOT SOLAR POWER) has 135 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Nov 16, 2020 to Aug 12, 2026), most of them in Riverside County (86), San Bernardino County (37) and Los Angeles County (9). CSLB lists license 890815 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-6, C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
135
Last 24 months
60
Total capacity
543.4 kW DC
Median system size
3.8 kW DC
With battery storage
0.7% all time; 0.0% last 24 months
Third-party owned
0.0% of 135 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
93 installs, latest Aug 12, 2026
Ownership types recorded
none recorded
Median battery size
10.1 kWh (1 installs list a capacity)
First install
Nov 16, 2020
Latest install
Aug 12, 2026
Counties
4
Utilities
SCE 135
CSLB license
890815

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202010
202150
2022230
2023200
2024371
2025280
2026 (through Aug 31, 2026)210

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

93 of its 135 interconnected installs (68.9% of the 135 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 12, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04231.1%1 (2.4%)
Net Billing Tariff9368.9%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on GSP (GOT SOLAR POWER)’s installs. No residential system in the file lists a third-party owner name that matches GSP (GOT SOLAR POWER) exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 60 of GSP (GOT SOLAR POWER)’s 60 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (21, 35.0%) used modules recorded as Trina Solar.

In the last 24 months, 60 of GSP (GOT SOLAR POWER)’s 60 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (60, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of GSP (GOT SOLAR POWER)’s 60 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerTrina Solar2148
EMMVEE Photovoltaic Power1938
Sonali Energees USA LLC1616
Bluesun Solar1not in top list
JinkoSolar1not in top list
Inverter makerEnphase60102
Battery makerEnphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 130 of 135 installs, inverters on 135. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
890815Sole owner license (name not shown)CLEARC-6; C-10 Electrical ContractorFeb 7, 2007Mar 31, 2027135

License numbers are the ones the utilities recorded on the interconnection applications (135 of 135 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 890815. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Riverside86
San Bernardino37
Los Angeles9
Orange3

Top cities

CityInstalls
Desert Hot Springs51
Cathedral City23
San Bernardino14
Highland6
Inglewood5
Fontana4
Palm Desert4
Rialto4
Palm Springs3
Corona2
Hesperia2
La Habra2
Montebello2
Yucca Valley2
Adelanto1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GSP (GOT SOLAR POWER)134
GSP GOT SOLAR POWER)1

Common questions

Where does GSP (GOT SOLAR POWER) install solar?

Its installs are spread across 4 counties. The most are in Riverside County (86 installs), followed by San Bernardino County (37).

How often does GSP (GOT SOLAR POWER) install batteries with solar?

0.7% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 60).

How many GSP (GOT SOLAR POWER) installs are under NEM 3.0 (the Net Billing Tariff)?

93 of its 135 interconnected installs (68.9% of the 135 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.