GREENCUBE SOLAR CORP

How many solar installs has GREENCUBE SOLAR CORP done in California, and which license number is on its installs?

GREENCUBE SOLAR CORP has 88 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Mar 16, 2023 to Aug 5, 2026), most of them in Los Angeles County (58), San Bernardino County (14) and Orange County (8). CSLB lists license 1068315 (GREENCUBE CORP) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
88
Last 24 months
24
Total capacity
471 kW DC
Median system size
4.8 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 88 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
71 installs, latest Aug 5, 2026
Ownership types recorded
none recorded
First install
Mar 16, 2023
Latest install
Aug 5, 2026
Counties
5
Utilities
SCE 87, SDGE 1
CSLB license
1068315

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
2023350
2024370
2025110
2026 (through Aug 31, 2026)50

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

71 of its 88 interconnected installs (80.7% of the 88 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 5, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.01719.3%0 (0.0%)
Net Billing Tariff7180.7%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on GREENCUBE SOLAR CORP’s installs. No residential system in the file lists a third-party owner name that matches GREENCUBE SOLAR CORP exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 24 of GREENCUBE SOLAR CORP’s 24 installs name a module maker in the “Generator Manufacturer” fields, and most of those (13, 54.2%) used modules recorded as CertainTeed.

In the last 24 months, 24 of GREENCUBE SOLAR CORP’s 24 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (23, 95.8%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCertainTeed1313
Panasonic516
Znshine550
Canadian Solar1not in top list
SunPower1not in top list
Inverter makerSolarEdge2354
Enphase127

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 88 of 88 installs, inverters on 88. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1068315GREENCUBE CORP (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorAug 28, 2020Aug 31, 202888

License numbers are the ones the utilities recorded on the interconnection applications (88 of 88 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1068315. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles58
San Bernardino14
Orange8
Riverside4
Ventura4

Top cities

CityInstalls
Compton4
Fontana4
Lancaster4
Long Beach4
Palmdale4
Hawthorne3
Inglewood3
San Bernardino3
Buena Park2
La Puente2
Los Angeles2
San Jacinto2
Simi Valley2
South Gate2
South Pasadena2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREENCUBE SOLAR CORP87
Greencube Solar Corp1

Common questions

Where does GREENCUBE SOLAR CORP install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (58 installs), followed by San Bernardino County (14).

How often does GREENCUBE SOLAR CORP install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 23). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many GREENCUBE SOLAR CORP installs are under NEM 3.0 (the Net Billing Tariff)?

71 of its 88 interconnected installs (80.7% of the 88 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.