GREENCAT INC

How many solar installs has GREENCAT INC done in California, and which license number is on its installs?

GREENCAT INC has 42 residential solar installs interconnected in California, active in the records from 2021 through 2024 (Jun 15, 2021 to Apr 15, 2024), most of them in Riverside County (22), San Bernardino County (12) and Los Angeles County (7). CSLB lists license 1047548 (GREENCAT INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-2, C-10, C-17, C-20, C-36, C-46, D-65, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
42
Last 24 months
0
Total capacity
386.5 kW DC
Median system size
8.4 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
4.8% of 42 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 2
First install
Jun 15, 2021
Latest install
Apr 15, 2024
Counties
4
Utilities
SCE 42
CSLB license
1047548

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
202140
2022320
202350
202410
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 42 interconnected installs with a tariff recorded (42) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.042100.0%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of GREENCAT INC’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches GREENCAT INC exactly.

Third-party owner named on its installsInstalls
SUNNOVA1
Sunnova Energy International1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 41 of GREENCAT INC’s 42 installs name a module maker in the “Generator Manufacturer” fields, and most of those (41, 100.0%) used modules recorded as Qcells.

Across all years, 42 of GREENCAT INC’s 42 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (16, 38.1%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells041
Inverter makerEnphase016
SolarEdge013
SunPower06
Tesla04
LG02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 41 of 42 installs, inverters on 42. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1047548GREENCAT INC (Corporation)CLEARB General Building Contractor; C-2; C-10 Electrical Contractor; C-17; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-46 Solar Contractor; D-65Dec 5, 2018Dec 31, 202642

License numbers are the ones the utilities recorded on the interconnection applications (42 of 42 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1047548. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list GREENCAT INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2022Total
unincorporated San Diego County104754811

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside22
San Bernardino12
Los Angeles7
Orange1

Top cities

CityInstalls
Hemet5
Perris5
Moreno Valley4
Fontana3
Nuevo2
Phelan2
Pomona2
Rialto2
Victorville2
Alta Loma1
Beaumont1
Carson1
Cerritos1
El Monte1
Highland1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
GREENCAT INC42

Common questions

Where does GREENCAT INC install solar?

Its installs are spread across 4 counties. The most are in Riverside County (22 installs), followed by San Bernardino County (12).

How often does GREENCAT INC install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many GREENCAT INC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 42 interconnected installs with a tariff recorded (42) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.