Green Wolf Energy

How many solar installs has Green Wolf Energy done in California, and which license number is on its installs?

Green Wolf Energy has 83 residential solar installs interconnected in California, active in the records from 2014 through 2021 (Jul 15, 2014 to Nov 17, 2021), most of them in Santa Clara County (28), Alameda County (23) and Contra Costa County (13). The license number recorded on most of its installs, 998581, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
83
Last 24 months
0
Total capacity
449.4 kW DC
Median system size
4.6 kW DC
With battery storage
3.6% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 83 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
88 kWh (1 installs list a capacity)
First install
Jul 15, 2014
Latest install
Nov 17, 2021
Counties
7
Utilities
PGE 83
CSLB license
998581

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201410
201510
201600
2017260
2018280
2019141
2020102
202130
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 83 interconnected installs with a tariff recorded (83) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.044.8%not counted
NEM 2.07995.2%3 (3.8%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Green Wolf Energy’s installs. No residential system in the file lists a third-party owner name that matches Green Wolf Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 77 of Green Wolf Energy’s 83 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (30, 39.0%) used modules recorded as Qcells.

Across all years, 83 of Green Wolf Energy’s 83 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (58, 69.9%) used inverters recorded as SolarEdge.

Across all years, 2 of Green Wolf Energy’s 83 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as LG.

2 of 3 battery-paired PG&E and SCE installs (66.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells030
JinkoSolar013
Canadian Solar08
Suniva08
Silfab04
Inverter makerSolarEdge058
Enphase016
APsystems (Altenergy Power System)011
Delta Electronics01
Power-One01
Battery makerLG02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 77 of 83 installs, inverters on 83. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Green Wolf Energy as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 8 kWh of storage. 1 have the status Paid, with $2,099 in current incentive allocations. Applications were received from Jul 10, 2019 to Jul 10, 2019.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid18$2,099

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage18$2,0991$2,099

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
998581Not found in the CSLB License Master file pulled Nov 4, 202681

License numbers are the ones the utilities recorded on the interconnection applications (82 of 83 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Santa Clara28
Alameda23
Contra Costa13
San Mateo8
San Joaquin6
Solano4
Marin1

Top cities

CityInstalls
San Jose18
Oakland8
Hayward5
Milpitas4
Berkeley3
Martinez3
Vallejo3
El Sobrante2
Livermore2
Morgan Hill2
Newark2
Pittsburg2
Redwood City2
Stockton2
Union City2

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Green Wolf Energy55
GREEN WOLF ENERGY INC13
green wolf energy8
Green Wolf Energy Inc.4
green wolf Energy1
green Wolf Energy1
GREEN WOLF ENERGY1

Common questions

Where does Green Wolf Energy install solar?

Its installs are spread across 7 counties. The most are in Santa Clara County (28 installs), followed by Alameda County (23).

How often does Green Wolf Energy install batteries with solar?

3.6% of its interconnected solar installs include battery storage across all years.

How many Green Wolf Energy installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 83 interconnected installs with a tariff recorded (83) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.