How many solar installs has green source eletric done in California, and which license number is on its installs?

green source eletric has 309 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Aug 25, 2021 to Aug 27, 2026), most of them in San Diego County (309). CSLB lists license 1075064 (SKY SOURCE SOLAR ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
309
Last 24 months
112
Total capacity
2,235.5 kW DC
Median system size
6.9 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
Third-party owned
0.0% of 309 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
139 installs, latest Aug 27, 2026
Ownership types recorded
none recorded
First install
Aug 25, 2021
Latest install
Aug 27, 2026
Counties
1
Utilities
SDGE 309
CSLB license
1075064

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021130
2022690
2023810
2024490
2025520
2026 (through Aug 31, 2026)450

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

139 of its 309 interconnected installs (45.0% of the 309 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Aug 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.017055.0%not recorded
Net Billing Tariff13945.0%not recorded

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on green source eletric’s installs. No residential system in the file lists a third-party owner name that matches green source eletric exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 112 of green source eletric’s 112 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (48, 42.9%) used modules recorded as LONGi.

In the last 24 months, 112 of green source eletric’s 112 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (85, 75.9%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi4862
Aptos Solar2934
Qcells22127
VietnamSunergyJointStockCompany917
Canadian Solar234
Inverter makerEnphase85275
Tesla2727

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 304 of 309 installs, inverters on 309. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1075064SKY SOURCE SOLAR ELECTRIC (Corporation)CLEARC-10 Electrical ContractorApr 22, 2021Apr 30, 2027309

License numbers are the ones the utilities recorded on the interconnection applications (309 of 309 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1075064. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list green source eletric’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202120222023202420252026Total
unincorporated San Diego County10750648404072624145

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego309

Top cities

CityInstalls
El Cajon144
San Diego72
Spring Valley15
La Mesa11
Jamul9
San Ysidro8
Chula Vista7
Santee7
Lakeside5
Carlsbad4
Escondido4
Imperial Beach4
Poway4
Alpine3
Oceanside3

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
green source eletric309

Common questions

Where does green source eletric install solar?

Its installs are spread across 1 county. The most are in San Diego County (309 installs).

How often does green source eletric install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many green source eletric installs are under NEM 3.0 (the Net Billing Tariff)?

139 of its 309 interconnected installs (45.0% of the 309 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.