Generation 819
How many solar installs has Generation 819 done in California, and which license number is on its installs?
Generation 819 has 130 residential solar installs interconnected in California, active in the records from 2014 through 2025 (Nov 18, 2014 to Jan 27, 2025), most of them in San Diego County (102), Orange County (24) and San Luis Obispo County (3). The license number recorded on most of its installs, 960715, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 130
- Last 24 months
- 1
- Total capacity
- 907.5 kW DC
- Median system size
- 6.1 kW DC
- With battery storage
- 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; not recorded (SDG&E files batteries as separate projects, not on the solar record) last 24 months
- Third-party owned
- 10.2% of 127 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 1 installs, latest Jan 27, 2025
- Ownership types recorded
- PPA 7, lease 6
- First install
- Nov 18, 2014
- Latest install
- Jan 27, 2025
- Counties
- 4
- Utilities
- SDGE 114, SCE 13, PGE 3
- CSLB license
- 960715, 1054977, 996041
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2014 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2014 | 1 | 0 |
| 2015 | 35 | 0 |
| 2016 | 28 | 0 |
| 2017 | 8 | 0 |
| 2018 | 17 | 0 |
| 2019 | 14 | 0 |
| 2020 | 15 | 0 |
| 2021 | 7 | 0 |
| 2022 | 4 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 1 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
1 of its 130 interconnected installs (0.8% of the 130 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The latest Net Billing Tariff install was approved Jan 27, 2025.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 64 | 49.2% | not counted |
| NEM 2.0 | 65 | 50.0% | 0 (0.0%) |
| Net Billing Tariff | 1 | 0.8% | not recorded |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 13 of Generation 819’s installs the utility recorded a third-party ownership type: PPA 7, lease 6, prepaid lease 0, other 0. Across all installers, 2 residential systems list a third-party owner name that matches Generation 819 exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| OneRoof Energy | 7 |
| SunPower | 3 |
| Generation 819 | 2 |
| Not assigned | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 1 of Generation 819’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as PhiladelphiaSolar.
In the last 24 months, 1 of Generation 819’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Tesla.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | PhiladelphiaSolar | 1 | not in top list |
| Inverter maker | Tesla | 1 | not in top list |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 124 of 130 installs, inverters on 130. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 960715 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 47 | ||||
| 1054977 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 17 | ||||
| 996041 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 14 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (83 of 130 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Local solar permits naming its license
Solar permits in city and county open data that list Generation 819’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | 2019 | Total |
|---|---|---|---|---|
| unincorporated San Diego County | 960715 | 3 | 1 | 4 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- Maedl Solar Inc: 128 installs, license 960715
Counties
| County | Installs |
|---|---|
| San Diego | 102 |
| Orange | 24 |
| San Luis Obispo | 3 |
| Riverside | 1 |
Top cities
| City | Installs |
|---|---|
| San Diego | 26 |
| Vista | 13 |
| Carlsbad | 9 |
| Encinitas | 8 |
| Oceanside | 7 |
| Orange | 6 |
| Escondido | 5 |
| La Jolla | 5 |
| El Cajon | 4 |
| Poway | 4 |
| San Clemente | 4 |
| San Marcos | 4 |
| Rancho Santa Fe | 3 |
| Spring Valley | 3 |
| Chula Vista | 2 |
Names as recorded by the utilities
The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Generation 819 | 127 |
| GENERATION 819 | 2 |
| Generation 819, Inc. | 1 |
Common questions
Where does Generation 819 install solar?
Its installs are spread across 4 counties. The most are in San Diego County (102 installs), followed by Orange County (24).
How often does Generation 819 install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many Generation 819 installs are under NEM 3.0 (the Net Billing Tariff)?
1 of its 130 interconnected installs (0.8% of the 130 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and battery storage is not recorded on those SDG&E solar records. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.