EVERGREEN SOLAR

How many solar installs has EVERGREEN SOLAR done in California, and which license number is on its installs?

EVERGREEN SOLAR has 86 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Aug 13, 2018 to Aug 20, 2026), most of them in Orange County (37), Los Angeles County (25) and San Diego County (8). CSLB lists license 1102899 (EVERGREEN SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
86
Last 24 months
63
Total capacity
765 kW DC
Median system size
8.9 kW DC
With battery storage
69.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 76.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
2.3% of 86 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
72 installs, latest Aug 20, 2026
Ownership types recorded
prepaid lease 2
Median battery size
20 kWh (54 installs list a capacity)
First install
Aug 13, 2018
Latest install
Aug 20, 2026
Counties
11
Utilities
SCE 63, PGE 15, SDGE 8
CSLB license
1102899, 1103998

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201810
201900
202000
202100
202200
202391
2024189
20252520
2026 (through Aug 31, 2026)3324

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

72 of its 86 interconnected installs (83.7% of the 86 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 73.5% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 20, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.01416.3%4 (40.0%)
Net Billing Tariff7283.7%50 (73.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2 of EVERGREEN SOLAR’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 2, other 0. No residential system in the file lists a third-party owner name that matches EVERGREEN SOLAR exactly.

Third-party owner named on its installsInstalls
SolSource2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 63 of EVERGREEN SOLAR’s 63 installs name a module maker in the “Generator Manufacturer” fields, and most of those (37, 58.7%) used modules recorded as Qcells.

In the last 24 months, 63 of EVERGREEN SOLAR’s 63 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (45, 71.4%) used inverters recorded as Enphase.

In the last 24 months, 46 of EVERGREEN SOLAR’s 63 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (30, 65.2%) used batteries recorded as Enphase.

52 of 54 battery-paired PG&E and SCE installs (96.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells3752
Hyundai77
Mission Solar58
REC44
CertainTeed2not in top list
Inverter makerEnphase4565
Tesla1213
Sol-Ark33
APsystems (Altenergy Power System)22
EG42not in top list
Battery makerEnphase3036
Tesla1313
Lithion Battery Inc.33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 85 of 86 installs, inverters on 86. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names EVERGREEN SOLAR as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 38 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Nov 22, 2024 to Nov 22, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled138$22,879

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency138$22,8790$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1102899EVERGREEN SOLAR (Corporation)CLEARC-46 Solar ContractorMar 24, 2023Mar 31, 202763
1103998EVERGREEN SOLAR (Corporation)CLEARC-46 Solar ContractorApr 26, 2023Apr 30, 202714

License numbers are the ones the utilities recorded on the interconnection applications (86 of 86 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 1102899, 1103998. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Orange37
Los Angeles25
San Diego8
Shasta6
Tehama4
Contra Costa1
Humboldt1
Kern1
Plumas1
Riverside1
San Francisco1

Top cities

CityInstalls
Long Beach15
Los Alamitos14
Seal Beach10
Cottonwood4
Corona del Mar3
El Cajon3
Newport Beach3
Anderson2
Compton2
Palos Verdes Estates2
Redding2
San Diego2
Bakersfield1
Escondido1
Fountain Valley1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
EVERGREEN SOLAR86

Common questions

Where does EVERGREEN SOLAR install solar?

Its installs are spread across 11 counties. The most are in Orange County (37 installs), followed by Los Angeles County (25).

How often does EVERGREEN SOLAR install batteries with solar?

69.2% of its interconnected solar installs include battery storage across all years, and 76.2% in the last 24 months (48 of 63). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many EVERGREEN SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

72 of its 86 interconnected installs (83.7% of the 86 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 73.5% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.