Earth Electric Inc

How many solar installs has Earth Electric Inc done in California, and which license number is on its installs?

Earth Electric Inc has 657 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Jun 11, 2009 to Aug 31, 2026), most of them in Santa Clara County (538), San Mateo County (59) and Alameda County (22). CSLB lists license 1003783 (EARTH ELECTRIC INCORPORATED) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Earth Electric Inc here carry more than one CSLB license number: 1003783 on 588 (CSLB holder EARTH ELECTRIC INCORPORATED, Campbell) and 560847 on 33 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
657
Last 24 months
83
Total capacity
4,480.3 kW DC
Median system size
6.3 kW DC
With battery storage
16.0% all time; 77.1% last 24 months
Third-party owned
0.0% of 657 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
78 installs, latest Aug 31, 2026
Ownership types recorded
none recorded
Median battery size
16 kWh (17 installs list a capacity)
First install
Jun 11, 2009
Latest install
Aug 31, 2026
Counties
11
Utilities
PGE 657
CSLB license
1003783, 560847

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200920
201000
201120
201270
2013100
2014300
2015480
2016370
2017240
2018300
2019620
2020470
2021464
20227813
20239110
20247626
20255546
2026 (through Aug 31, 2026)126

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

78 of its 657 interconnected installs (11.9% of the 657 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.013921.2%not counted
NEM 2.044067.0%37 (8.4%)
Net Billing Tariff7811.9%65 (83.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Earth Electric Inc’s installs. No residential system in the file lists a third-party owner name that matches Earth Electric Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 77 of Earth Electric Inc’s 83 installs name a module maker in the “Generator Manufacturer” fields, and most of those (67, 87.0%) used modules recorded as REC.

In the last 24 months, 83 of Earth Electric Inc’s 83 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (64, 77.1%) used inverters recorded as Enphase.

In the last 24 months, 60 of Earth Electric Inc’s 83 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (33, 55.0%) used batteries recorded as Enphase.

95 of 105 battery-paired PG&E and SCE installs (90.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC67115
Hyundai4not in top list
Panasonic2111
SEG Solar2not in top list
SunPower2not in top list
Inverter makerEnphase64334
Tesla3033
FranklinWH28
SolarEdge2290
Xantrex Technology Inc.2not in top list
Battery makerEnphase3349
Tesla2526
FranklinWH26

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 637 of 657 installs, inverters on 657. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Earth Electric Inc as developer on 10 battery storage projects and as installer on 10 (10 name it as both), 10 projects in all with 180 kWh of storage. 6 have the status Paid, with $21,717 in current incentive allocations. Applications were received from Aug 17, 2021 to Dec 29, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid6119$21,717
Reserved19$22,148
Cancelled352$10,139

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage557$8,4963$4,305
Large-Scale Storage4114$23,3613$17,412
Residential Solar and Storage Equity - AB 209 Non-POU19$22,1480$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1003783EARTH ELECTRIC INCORPORATED (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorMay 18, 2015May 31, 2027588
560847Not found in the CSLB License Master file pulled Nov 4, 202633

License numbers are the ones the utilities recorded on the interconnection applications (622 of 657 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1003783. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Santa Clara538
San Mateo59
Alameda22
Santa Cruz22
San Benito6
Monterey3
Contra Costa2
Marin2
Merced1
San Joaquin1
San Luis Obispo1

Top cities

CityInstalls
San Jose304
Sunnyvale53
Los Altos27
Saratoga27
Cupertino24
Los Gatos23
Morgan Hill19
Campbell16
Redwood City16
Fremont14
Milpitas14
Mountain View14
Menlo Park12
Gilroy9
San Mateo7

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
EARTH ELECTRIC INCORPORATED420
Earth Electric Inc106
Earth Electric93
Earth Electric, Inc36
EARTH ELECTRIC INC1
Earth Electric Inc.1

Common questions

Where does Earth Electric Inc install solar?

Its installs are spread across 11 counties. The most are in Santa Clara County (538 installs), followed by San Mateo County (59).

How often does Earth Electric Inc install batteries with solar?

16.0% of its interconnected solar installs include battery storage across all years, and 77.1% in the last 24 months (64 of 83).

How many Earth Electric Inc installs are under NEM 3.0 (the Net Billing Tariff)?

78 of its 657 interconnected installs (11.9% of the 657 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 83.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.