DeLion Electrical Contractors

How many solar installs has DeLion Electrical Contractors done in California, and which license number is on its installs?

DeLion Electrical Contractors has 57 residential solar installs interconnected in California, active in the records from 2015 through 2025 (Dec 29, 2015 to May 16, 2025), most of them in Riverside County (45), San Bernardino County (7) and San Diego County (4). CSLB lists license 990101 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
57
Last 24 months
2
Total capacity
515 kW DC
Median system size
9.1 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.0% of 57 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
3 installs, latest May 16, 2025
Ownership types recorded
none recorded
First install
Dec 29, 2015
Latest install
May 16, 2025
Counties
4
Utilities
SCE 52, SDGE 4, PGE 1
CSLB license
990101

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201510
201610
201790
2018130
201970
202050
202180
202260
202350
202410
202510
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

3 of its 57 interconnected installs (5.3% of the 57 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved May 16, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0712.3%not counted
NEM 2.04782.5%0 (0.0%)
Net Billing Tariff35.3%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on DeLion Electrical Contractors’s installs. No residential system in the file lists a third-party owner name that matches DeLion Electrical Contractors exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 2 of DeLion Electrical Contractors’ 2 installs name a module maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used modules recorded as Qcells.

In the last 24 months, 2 of DeLion Electrical Contractors’ 2 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells216
Inverter makerEnphase220

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 55 of 57 installs, inverters on 57. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
990101Sole owner license (name not shown)CLEARC-10 Electrical ContractorJan 23, 2014Jan 31, 202856

License numbers are the ones the utilities recorded on the interconnection applications (56 of 57 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 990101. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list DeLion Electrical Contractors’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018Total
unincorporated San Diego County99010111

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Riverside45
San Bernardino7
San Diego4
Contra Costa1

Top cities

CityInstalls
Murrieta11
Menifee6
Eastvale4
Hemet4
Canyon Lake3
Chino3
Perris3
Corona2
Quail Valley2
Riverside2
Temecula2
Wildomar2
Carlsbad1
Chino Hills1
Fontana1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
DELION ELECTRICAL CONTRACTORS32
DeLion Electrical Contractors20
delion electrical contractors4
Delion Electrical Contractors1

Common questions

Where does DeLion Electrical Contractors install solar?

Its installs are spread across 4 counties. The most are in Riverside County (45 installs), followed by San Bernardino County (7).

How often does DeLion Electrical Contractors install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 2). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many DeLion Electrical Contractors installs are under NEM 3.0 (the Net Billing Tariff)?

3 of its 57 interconnected installs (5.3% of the 57 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.