CLEAN POWER GROUP INC

How many solar installs has CLEAN POWER GROUP INC done in California, and which license number is on its installs?

CLEAN POWER GROUP INC has 79 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Jun 18, 2023 to Jul 17, 2026), most of them in Los Angeles County (54), Ventura County (12) and San Bernardino County (6). CSLB lists license 924297 (CPG SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-39, C-46, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
79
Last 24 months
58
Total capacity
680.1 kW DC
Median system size
8.2 kW DC
With battery storage
67.1% all time; 81.0% last 24 months
Third-party owned
0.0% of 79 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
76 installs, latest Jul 17, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (53 installs list a capacity)
First install
Jun 18, 2023
Latest install
Jul 17, 2026
Counties
7
Utilities
SCE 78, PGE 1
CSLB license
924297

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
2023131
2024139
20253529
2026 (through Aug 31, 2026)1814

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

76 of its 79 interconnected installs (96.2% of the 79 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 69.7% of those include battery storage. The latest Net Billing Tariff install was approved Jul 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.033.8%0 (0.0%)
Net Billing Tariff7696.2%53 (69.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CLEAN POWER GROUP INC’s installs. No residential system in the file lists a third-party owner name that matches CLEAN POWER GROUP INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 58 of CLEAN POWER GROUP INC’s 58 installs name a module maker in the “Generator Manufacturer” fields, and most of those (31, 53.4%) used modules recorded as Qcells.

In the last 24 months, 58 of CLEAN POWER GROUP INC’s 58 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (49, 84.5%) used inverters recorded as Tesla.

In the last 24 months, 47 of CLEAN POWER GROUP INC’s 58 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (46, 97.9%) used batteries recorded as Tesla.

53 of 53 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells3152
Aptos Solar1414
JA Solar88
REC55
SunPower11
Inverter makerTesla4954
APsystems (Altenergy Power System)44
Enphase418
AP Systems11
Battery makerTesla4652
Enphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 79 of 79 installs, inverters on 79. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names CLEAN POWER GROUP INC as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 10 kWh of storage. 1 have the status Paid, with $1,738 in current incentive allocations. Applications were received from May 2, 2022 to May 2, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid110$1,738

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage110$1,7381$1,738

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
924297CPG SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-39 Roofing Contractor; C-46 Solar ContractorOct 28, 2008Feb 28, 202779

License numbers are the ones the utilities recorded on the interconnection applications (79 of 79 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 924297. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles54
Ventura12
San Bernardino6
Orange4
Fresno1
Kern1
Santa Barbara1

Top cities

CityInstalls
Santa Clarita9
Whittier6
Canyon Country4
San Bernardino4
Thousand Oaks4
Castaic3
La Mirada3
Lancaster3
Palmdale3
Simi Valley3
Valencia3
Fullerton2
Newbury Park2
Newhall2
Santa Rosa Valley2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CLEAN POWER GROUP INC79

Common questions

Where does CLEAN POWER GROUP INC install solar?

Its installs are spread across 7 counties. The most are in Los Angeles County (54 installs), followed by Ventura County (12).

How often does CLEAN POWER GROUP INC install batteries with solar?

67.1% of its interconnected solar installs include battery storage across all years, and 81.0% in the last 24 months (47 of 58).

How many CLEAN POWER GROUP INC installs are under NEM 3.0 (the Net Billing Tariff)?

76 of its 79 interconnected installs (96.2% of the 79 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 69.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.