Clean Energy Solar has 56 residential solar installs interconnected in California, active in the records from 2012 through 2017 (May 17, 2012 to Aug 21, 2017), most of them in San Diego County (49), Riverside County (3) and San Bernardino County (2). The license number recorded on most of its installs, 995626, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
56
Last 24 months
0
Total capacity
377.6 kW DC
Median system size
5.8 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
6.1% of 49 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 3
First install
May 17, 2012
Latest install
Aug 21, 2017
Counties
5
Utilities
SDGE 50, SCE 6
CSLB license
995626

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
201230
201300
201440
2015130
2016260
2017100
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 56 interconnected installs with a tariff recorded (56) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03460.7%not counted
NEM 2.02239.3%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 3 of Clean Energy Solar’s installs the utility recorded a third-party ownership type: PPA 0, lease 3, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Clean Energy Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunrun2
Hero1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 53 of Clean Energy Solar’s 56 installs name a module maker in the “Generator Manufacturer” fields, and most of those (44, 83.0%) used modules recorded as LG.

Across all years, 56 of Clean Energy Solar’s 56 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (47, 83.9%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG044
SolarWorld05
Hyundai02
Qcells01
Trina Solar01
Inverter makerEnphase047
SMA06
SolarEdge03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 53 of 56 installs, inverters on 56. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
995626Not found in the CSLB License Master file pulled Nov 4, 202622

License numbers are the ones the utilities recorded on the interconnection applications (27 of 56 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
San Diego49
Riverside3
San Bernardino2
Los Angeles1
Orange1

Top cities

CityInstalls
San Diego23
La Jolla5
El Cajon4
Bonita2
Chula Vista2
Encinitas2
Escondido2
Temecula2
Valley Center2
Alpine1
Bloomington1
Fallbrook1
Los Angeles1
Oceanside1
Perris1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Clean Energy Solar55
CLEAN ENERGY SOLAR1

Common questions

Where does Clean Energy Solar install solar?

Its installs are spread across 5 counties. The most are in San Diego County (49 installs), followed by Riverside County (3).

How often does Clean Energy Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Clean Energy Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 56 interconnected installs with a tariff recorded (56) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.