Cabrera Duston Inc

How many solar installs has Cabrera Duston Inc done in California, and which license number is on its installs?

Cabrera Duston Inc has 47 residential solar installs interconnected in California, active in the records from 2009 through 2019 (Apr 3, 2009 to Feb 21, 2019), most of them in Fresno County (15), Madera County (11) and Los Angeles County (9). The license number recorded on most of its installs, 908853, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
47
Last 24 months
0
Total capacity
249.5 kW DC
Median system size
4.7 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 47 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Apr 3, 2009
Latest install
Feb 21, 2019
Counties
10
Utilities
PGE 34, SCE 13
CSLB license
908853

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201000
201100
201200
201300
201400
201500
201600
2017340
2018110
201910
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 47 interconnected installs with a tariff recorded (47) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0510.6%not counted
NEM 2.04289.4%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Cabrera Duston Inc’s installs. No residential system in the file lists a third-party owner name that matches Cabrera Duston Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 47 of Cabrera Duston Inc’s 47 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (18, 38.3%) used modules recorded as Canadian Solar.

Across all years, 47 of Cabrera Duston Inc’s 47 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (44, 93.6%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar018
S-Energy012
Hyundai08
SolarWorld03
Qcells02
Inverter makerSolarEdge044
Fronius02
Enphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 47 of 47 installs, inverters on 47. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
908853Not found in the CSLB License Master file pulled Nov 4, 202646

License numbers are the ones the utilities recorded on the interconnection applications (46 of 47 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Fresno15
Madera11
Los Angeles9
San Joaquin3
Tulare3
San Bernardino2
Alameda1
Kings1
Monterey1
Stanislaus1

Top cities

CityInstalls
Fresno13
Madera9
Palmdale6
Chowchilla2
Clovis2
Lancaster2
Stockton2
Adelanto1
Hanford1
Hesperia1
King City1
Littlerock1
Oakdale1
Oakland1
Orosi1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Cabrera Duston Inc34
Cabrera Duston Inc.8
CABRERA DUSTON INC4
Cabrera Duston Inc. dba GC Services1

Common questions

Where does Cabrera Duston Inc install solar?

Its installs are spread across 10 counties. The most are in Fresno County (15 installs), followed by Madera County (11).

How often does Cabrera Duston Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Cabrera Duston Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 47 interconnected installs with a tariff recorded (47) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.