Burmax Energy

How many solar installs has Burmax Energy done in California, and which license number is on its installs?

Burmax Energy has 208 residential solar installs interconnected in California, active in the records from 2016 through 2018 (Jun 22, 2016 to Jul 27, 2018), most of them in San Diego County (207) and Orange County (1). CSLB lists license 1019515 (BURTEK ENERGY LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, B, C-10, C-20, C-46, expires Oct 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Burmax Energy here carry more than one CSLB license number: 1019515 on 172 (CSLB holder BURTEK ENERGY LLC, San Diego) and 1000602 on 35 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
208
Last 24 months
0
Total capacity
1,202.1 kW DC
Median system size
5.2 kW DC
With battery storage
not recorded (SDG&E files batteries as separate projects, not on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
38.5% of 208 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 1, lease 79
First install
Jun 22, 2016
Latest install
Jul 27, 2018
Counties
2
Utilities
SDGE 208
CSLB license
1019515, 1000602

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016490
20171180
2018410
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 208 interconnected installs with a tariff recorded (208) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.062.9%not counted
NEM 2.020297.1%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 80 of Burmax Energy’s installs the utility recorded a third-party ownership type: PPA 1, lease 79, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Burmax Energy exactly.

Third-party owner named on its installsInstalls
Burmax LLC62
Jay Burden11
Pacific Design Build6
Burmax LLC/J. Burden1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 204 of Burmax Energy’s 208 installs name a module maker in the “Generator Manufacturer” fields, and most of those (199, 97.5%) used modules recorded as SunPower.

Across all years, 208 of Burmax Energy’s 208 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (199, 95.7%) used inverters recorded as SunPower.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower0199
LG04
Panasonic01
Inverter makerSunPower0199
Enphase05
SMA05
ABB01
SolarEdge01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 204 of 208 installs, inverters on 208. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1019515BURTEK ENERGY LLC (Limited Liability)CLEARA General Engineering Contractor; B General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar ContractorOct 19, 2016Oct 31, 2028172
1000602Not found in the CSLB License Master file pulled Nov 4, 202635

License numbers are the ones the utilities recorded on the interconnection applications (208 of 208 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1019515. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Burmax Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
unincorporated San Diego County101951514711712131258

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
San Diego207
Orange1

Top cities

CityInstalls
Escondido76
San Diego43
El Cajon24
Lakeside11
Oceanside7
Santee7
Chula Vista6
Lemon Grove4
Poway4
San Marcos4
Vista4
Cardiff3
Spring Valley3
Valley Center3
Fallbrook2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Burmax Energy208

Common questions

Where does Burmax Energy install solar?

Its installs are spread across 2 counties. The most are in San Diego County (207 installs), followed by Orange County (1).

How often does Burmax Energy install batteries with solar?

Battery storage is not recorded on its interconnected solar installs: SDG&E files a battery as its own project record, not on the solar record.

How many Burmax Energy installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 208 interconnected installs with a tariff recorded (208) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.