BEST Solar
How many solar installs has BEST Solar done in California, and which license number is on its installs?
BEST Solar has 217 residential solar installs interconnected in California, active in the records from 2017 through 2019 (Oct 24, 2017 to Oct 4, 2019), most of them in Los Angeles County (131), Kern County (32) and Orange County (23). CSLB lists license 988425 (BEST SOLAR POWER INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Nov 30, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to BEST Solar here carry more than one CSLB license number: 988425 on 178 (CSLB holder BEST SOLAR POWER INC, Sherman Oaks) and 849058 on 33 (CSLB holder Sole owner license (name not shown)), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 217
- Last 24 months
- 0
- Total capacity
- 1,083.8 kW DC
- Median system size
- 4.5 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 1.4% of 217 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 2, lease 1
- First install
- Oct 24, 2017
- Latest install
- Oct 4, 2019
- Counties
- 7
- Utilities
- SCE 184, PGE 33
- CSLB license
- 988425, 849058
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2017 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2017 | 13 | 0 |
| 2018 | 109 | 0 |
| 2019 | 95 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 217 interconnected installs with a tariff recorded (217) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 217 | 100.0% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 3 of BEST Solar’s installs the utility recorded a third-party ownership type: PPA 2, lease 1, prepaid lease 0, other 0. Across all installers, 2 residential systems list a third-party owner name that matches BEST Solar exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Lifestyle Energy | 1 |
| Spruce | 1 |
| Sunrun | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 216 of BEST Solar’s 217 installs name a module maker in the “Generator Manufacturer” fields, and most of those (116, 53.7%) used modules recorded as SolarWorld.
Across all years, 217 of BEST Solar’s 217 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (191, 88.0%) used inverters recorded as SolarEdge.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SolarWorld | 0 | 116 |
| Mission Solar | 0 | 57 | |
| Qcells | 0 | 13 | |
| JinkoSolar | 0 | 8 | |
| Silfab | 0 | 8 | |
| Inverter maker | SolarEdge | 0 | 191 |
| Enphase | 0 | 23 | |
| SMA | 0 | 2 | |
| Fronius | 0 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 216 of 217 installs, inverters on 217. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 988425 | BEST SOLAR POWER INC (Corporation) | CLEAR, Pending Case/CIT | B General Building Contractor; C-10 Electrical Contractor | Nov 13, 2013 | Nov 30, 2027 | 178 |
| 849058 | Sole owner license (name not shown) | CLEAR, DISC Bond Filed | C-10 Electrical Contractor | Oct 29, 2004 | Oct 31, 2028 | 33 |
License numbers are the ones the utilities recorded on the interconnection applications (214 of 217 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
CSLB’s License Master file lists a disciplinary bond on license 849058 (bond reason recorded: Conditional), required Sep 16, 2025, $25,000, CSLB case number 2023000262, bond cancelled Nov 28, 2025. CSLB lists license 849058 as a sole owner license (name not shown); the bond is on the license, as CSLB records it. Current CSLB record: 849058.
What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.
Local solar permits naming its license
Solar permits in city and county open data that list BEST Solar’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2018 | Total |
|---|---|---|---|
| unincorporated San Diego County | 988425 | 2 | 2 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- Best Solar Power Inc: 505 installs, license 988425
- BEST REMODELING AND DEVELOPMENT: 39 installs, license 988425
- BAIZE ELECTRIC SOLAR TECHNOLOGIES: 331 installs, license 849058
- Baize Electric and Solar Technologies: 35 installs, license 849058
Counties
| County | Installs |
|---|---|
| Los Angeles | 131 |
| Kern | 32 |
| Orange | 23 |
| Ventura | 14 |
| San Bernardino | 10 |
| Riverside | 6 |
| Tulare | 1 |
Top cities
| City | Installs |
|---|---|
| Bakersfield | 30 |
| Lancaster | 12 |
| Palmdale | 8 |
| Long Beach | 7 |
| Torrance | 7 |
| Whittier | 7 |
| Pomona | 6 |
| Covina | 5 |
| Huntington Beach | 5 |
| Santa Ana | 5 |
| Simi Valley | 5 |
| Camarillo | 4 |
| Duarte | 4 |
| Lakewood | 4 |
| Castaic | 3 |
Names as recorded by the utilities
The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| best solar | 144 |
| BEST SOLAR | 32 |
| BEST Solar | 30 |
| Best Solar | 10 |
| Best Solar Inc. | 1 |
Common questions
Where does BEST Solar install solar?
Its installs are spread across 7 counties. The most are in Los Angeles County (131 installs), followed by Kern County (32).
How often does BEST Solar install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many BEST Solar installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 217 interconnected installs with a tariff recorded (217) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.