Basad Construction

How many solar installs has Basad Construction done in California, and which license number is on its installs?

Basad Construction has 95 residential solar installs interconnected in California, active in the records from 2015 through 2024 (Nov 23, 2015 to May 20, 2024), most of them in Los Angeles County (66), Ventura County (19) and San Bernardino County (4). CSLB lists license 987760 (GREEN 360 SOLUTIONS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Oct 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
95
Last 24 months
0
Total capacity
985.9 kW DC
Median system size
9.9 kW DC
With battery storage
2.1% all time; no installs in the last 24 months last 24 months
Third-party owned
1.1% of 95 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest May 20, 2024
Ownership types recorded
PPA 1
Median battery size
10.1 kWh (2 installs list a capacity)
First install
Nov 23, 2015
Latest install
May 20, 2024
Counties
7
Utilities
SCE 93, PGE 2
CSLB license
987760

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201520
2016130
2017130
2018100
201970
2020110
202190
2022150
2023120
202432
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 95 interconnected installs (2.1% of the 95 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved May 20, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02122.1%not counted
NEM 2.07275.8%0 (0.0%)
Net Billing Tariff22.1%2 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Basad Construction’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Basad Construction exactly.

Third-party owner named on its installsInstalls
SunEdison1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 95 of Basad Construction’s 95 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (24, 25.3%) used modules recorded as SolarWorld.

Across all years, 95 of Basad Construction’s 95 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (71, 74.7%) used inverters recorded as SolarEdge.

Across all years, 2 of Basad Construction’s 95 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Enphase.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSolarWorld024
REC020
Canadian Solar014
Hyundai013
Qcells011
Inverter makerSolarEdge071
Enphase016
SunPower06
SMA01
Tesla01
Battery makerEnphase02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 95 of 95 installs, inverters on 95. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Basad Construction as developer on 1 battery storage project and as installer on 1 (1 name it as both), 1 projects in all with 8 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Feb 8, 2018 to Feb 8, 2018.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled18$3,358

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage18$3,3580$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
987760GREEN 360 SOLUTIONS (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorOct 17, 2013Oct 31, 202792

License numbers are the ones the utilities recorded on the interconnection applications (93 of 95 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 987760. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles66
Ventura19
San Bernardino4
Orange2
Riverside2
Alameda1
Kern1

Top cities

CityInstalls
Thousand Oaks7
Simi Valley6
Glendora5
Santa Clarita4
Calabasas3
Canyon Country3
Culver City3
San Marino3
Whittier3
Agoura Hills2
Altadena2
Castaic2
La Crescenta2
Lakewood2
Long Beach2

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BASAD CONSTRUCTION INCORPORATED72
Basad Construction20
Basad Construction DBA Elite Solar3

Common questions

Where does Basad Construction install solar?

Its installs are spread across 7 counties. The most are in Los Angeles County (66 installs), followed by Ventura County (19).

How often does Basad Construction install batteries with solar?

2.1% of its interconnected solar installs include battery storage across all years.

How many Basad Construction installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 95 interconnected installs (2.1% of the 95 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.