Advanced Conservation Systems, Inc.
How many solar installs has Advanced Conservation Systems, Inc. done in California, and which license number is on its installs?
Advanced Conservation Systems, Inc. has 187 residential solar installs interconnected in California, active in the records from 2008 through 2026 (Dec 23, 2008 to Aug 21, 2026), most of them in Los Angeles County (134), Kern County (30) and San Bernardino County (16). CSLB lists license 508902 (ADVANCED CONSERVATION SYSTEMS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-2, C-46, expires Apr 30, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 187
- Last 24 months
- 16
- Total capacity
- 1,552 kW DC
- Median system size
- 7.5 kW DC
- With battery storage
- 18.2% all time; 93.8% last 24 months
- Third-party owned
- 0.5% of 187 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 18 installs, latest Aug 17, 2026
- Ownership types recorded
- PPA 1
- Median battery size
- 10.5 kWh (33 installs list a capacity)
- First install
- Dec 23, 2008
- Latest install
- Aug 21, 2026
- Counties
- 8
- Utilities
- SCE 178, PGE 9
- CSLB license
- 508902
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2008 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2008 | 1 | 0 |
| 2009 | 0 | 0 |
| 2010 | 1 | 0 |
| 2011 | 0 | 0 |
| 2012 | 0 | 0 |
| 2013 | 0 | 0 |
| 2014 | 0 | 0 |
| 2015 | 13 | 0 |
| 2016 | 13 | 0 |
| 2017 | 7 | 0 |
| 2018 | 7 | 0 |
| 2019 | 9 | 0 |
| 2020 | 13 | 1 |
| 2021 | 38 | 7 |
| 2022 | 24 | 3 |
| 2023 | 34 | 3 |
| 2024 | 15 | 9 |
| 2025 | 6 | 6 |
| 2026 (through Aug 31, 2026) | 6 | 5 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
18 of its 187 interconnected installs (9.6% of the 187 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 17, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 35 | 18.7% | not counted |
| NEM 2.0 | 134 | 71.7% | 16 (11.9%) |
| Net Billing Tariff | 18 | 9.6% | 17 (94.4%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 1 of Advanced Conservation Systems, Inc.’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Advanced Conservation Systems, Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Advanced Conservation Systems | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 16 of Advanced Conservation Systems, Inc.’s 16 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4, 25.0%) used modules recorded as Canadian Solar.
In the last 24 months, 16 of Advanced Conservation Systems, Inc.’s 16 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (8, 50.0%) used inverters recorded as Tesla.
In the last 24 months, 12 of Advanced Conservation Systems, Inc.’s 16 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (8, 66.7%) used batteries recorded as Tesla.
30 of 34 battery-paired PG&E and SCE installs (88.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Canadian Solar | 4 | 17 |
| JA Solar | 2 | not in top list | |
| Mission Solar | 2 | not in top list | |
| Tesla | 2 | not in top list | |
| Hyundai | 1 | 32 | |
| Inverter maker | Tesla | 8 | 10 |
| Enphase | 6 | 81 | |
| Sol-Ark | 2 | not in top list | |
| Battery maker | Tesla | 8 | 8 |
| Enphase | 4 | 11 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 181 of 187 installs, inverters on 187. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Advanced Conservation Systems, Inc. as developer on 123 battery storage projects and as installer on 113 (113 name it as both), 123 projects in all with 1,876 kWh of storage. 10 have the status Paid, with $157,380 in current incentive allocations. Applications were received from Sep 30, 2020 to Dec 11, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 10 | 179 | $157,380 |
| Reserved | 43 | 632 | $1,353,356 |
| Pending Reservation | 9 | 185 | $322,917 |
| Waitlist | 28 | 383 | $817,199 |
| Cancelled | 33 | 497 | $368,025 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Residential Solar and Storage Equity - AB 209 Non-POU | 67 | 922 | $2,055,896 | 0 | $0 |
| Equity Resiliency | 24 | 524 | $495,979 | 7 | $152,566 |
| Small Residential Storage | 19 | 208 | $32,466 | 3 | $4,814 |
| Residential Solar and Storage Equity - AB 209 | 9 | 172 | $400,849 | 0 | $0 |
| Residential Storage Equity | 3 | 33 | $27,720 | 0 | $0 |
| Large-Scale Storage | 1 | 17 | $5,966 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 508902 | ADVANCED CONSERVATION SYSTEMS INC (Corporation) | CLEAR | B General Building Contractor; C-2; C-46 Solar Contractor | Apr 10, 1987 | Apr 30, 2027 | 187 |
License numbers are the ones the utilities recorded on the interconnection applications (187 of 187 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 508902. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Counties
| County | Installs |
|---|---|
| Los Angeles | 134 |
| Kern | 30 |
| San Bernardino | 16 |
| Orange | 2 |
| Riverside | 2 |
| Alameda | 1 |
| Santa Clara | 1 |
| Ventura | 1 |
Top cities
| City | Installs |
|---|---|
| Lancaster | 63 |
| Palmdale | 37 |
| Rosamond | 10 |
| Bakersfield | 7 |
| Acton | 5 |
| Ridgecrest | 5 |
| Canyon Country | 3 |
| Fontana | 3 |
| Victorville | 3 |
| Agoura Hills | 2 |
| Apple Valley | 2 |
| Caliente | 2 |
| Castaic | 2 |
| Littlerock | 2 |
| Los Angeles | 2 |
Names as recorded by the utilities
The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| ADVANCED CONSERVATION SYSTEMS INC | 157 |
| Advanced Conservation Systems, Inc. | 25 |
| Advanced Conservation Systems, INC. | 5 |
Common questions
Where does Advanced Conservation Systems, Inc. install solar?
Its installs are spread across 8 counties. The most are in Los Angeles County (134 installs), followed by Kern County (30).
How often does Advanced Conservation Systems, Inc. install batteries with solar?
18.2% of its interconnected solar installs include battery storage across all years, and 93.8% in the last 24 months (15 of 16).
How many Advanced Conservation Systems, Inc. installs are under NEM 3.0 (the Net Billing Tariff)?
18 of its 187 interconnected installs (9.6% of the 187 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.