A G ELECTRIC

How many solar installs has A G ELECTRIC done in California, and which license number is on its installs?

A G ELECTRIC has 261 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Jan 6, 2020 to Jul 16, 2026), most of them in Orange County (194), Los Angeles County (63) and San Bernardino County (3). CSLB lists license 793786 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
261
Last 24 months
44
Total capacity
1,972.1 kW DC
Median system size
6.8 kW DC
With battery storage
21.1% all time; 86.4% last 24 months
Third-party owned
0.0% of 261 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
55 installs, latest Jul 16, 2026
Ownership types recorded
none recorded
Median battery size
10.1 kWh (55 installs list a capacity)
First install
Jan 6, 2020
Latest install
Jul 16, 2026
Counties
4
Utilities
SCE 261
CSLB license
793786

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020160
2021382
2022756
2023809
202491
20252217
2026 (through Aug 31, 2026)2120

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

55 of its 261 interconnected installs (21.1% of the 261 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.7% of those include battery storage. The latest Net Billing Tariff install was approved Jul 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.020678.9%15 (7.3%)
Net Billing Tariff5521.1%40 (72.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on A G ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches A G ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 44 of A G ELECTRIC’s 44 installs name a module maker in the “Generator Manufacturer” fields, and most of those (36, 81.8%) used modules recorded as REC.

In the last 24 months, 44 of A G ELECTRIC’s 44 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (34, 77.3%) used inverters recorded as Enphase.

In the last 24 months, 38 of A G ELECTRIC’s 44 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (27, 71.1%) used batteries recorded as Enphase.

54 of 55 battery-paired PG&E and SCE installs (98.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC36168
JA Solar44
Hyundai33
Tesla1not in top list
Inverter makerEnphase34134
Tesla1023
Battery makerEnphase2743
Tesla1010
FranklinWH11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 256 of 261 installs, inverters on 261. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
793786Sole owner license (name not shown)CLEARC-10 Electrical ContractorApr 13, 2001Apr 30, 2027261

License numbers are the ones the utilities recorded on the interconnection applications (261 of 261 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 793786. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Orange194
Los Angeles63
San Bernardino3
Riverside1

Top cities

CityInstalls
Irvine27
Huntington Beach16
Orange16
Costa Mesa13
Cypress12
Garden Grove11
Lake Forest11
Fountain Valley10
Fullerton10
Long Beach10
Santa Ana10
Cerritos9
Tustin9
Los Alamitos8
Westminster8

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
A G ELECTRIC261

Common questions

Where does A G ELECTRIC install solar?

Its installs are spread across 4 counties. The most are in Orange County (194 installs), followed by Los Angeles County (63).

How often does A G ELECTRIC install batteries with solar?

21.1% of its interconnected solar installs include battery storage across all years, and 86.4% in the last 24 months (38 of 44).

How many A G ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

55 of its 261 interconnected installs (21.1% of the 261 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 72.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.